{"id":434389,"date":"2024-10-20T07:43:50","date_gmt":"2024-10-20T07:43:50","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-152592023\/"},"modified":"2024-10-26T14:40:16","modified_gmt":"2024-10-26T14:40:16","slug":"bs-iso-152592023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-152592023\/","title":{"rendered":"BS ISO 15259:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4 Symbols and abbreviated terms 4.1 Symbols <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.2 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5 Principles 5.1 General <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.2 Measurement section and measurement site <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.3 Measurement objective and measurement plan 5.4 Sampling strategy 5.5 Measurement report 6 Measurement section and measurement site 6.1 General <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.2 Measurement section 6.2.1 Measurement section and measurement plane <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.2.2 Measurement ports 6.2.3 Working area and working platform <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.3 Measurement site 6.3.1 Power supply and equipment 6.3.2 Safety and environmental conditions <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7 Measurement objective and measurement plan 7.1 Measurement objective 7.1.1 Specification of the measurement objective 7.1.2 Identification and review of the measurement objective <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.2 Measurement plan 7.2.1 Specification of measurement plan 7.2.2 Plant operating conditions and load characteristics <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7.2.3 Number of individual measurements 7.2.4 Timing and duration of individual measurements <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.2.5 Measurement points 7.2.6 Measurement methods 7.2.7 Measurement section and measurement site 7.2.8 Technical supervisor and necessary personnel <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7.2.9 Planning of the measurement dates 7.2.10 Preparation of the measurement <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8 Sampling strategy 8.1 General <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 8.2 Measurement of particulates and other components by grid measurements <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 8.3 Determination of homogeneity <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 8.4 Permanently installed AMS <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 9 Measurement report <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Annex A (informative) Design and construction of measurement sites <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex B (informative) Measurement planning <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Annex C (informative) Conversion to reference quantities <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Annex D (normative) Sampling strategy <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Annex E (informative) Examples for determining homogeneity of waste gas profiles <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Annex F (informative) Example form of emission measurement report <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | Annex G (informative) Theoretical basis for the determination of the mean concentration in the measurement plane <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Air quality. Measurement of stationary source emissions. Requirements for measurement sections and sites and for the measurement objective, plan and report<\/b><\/p>\n |