{"id":257848,"date":"2024-10-19T17:03:39","date_gmt":"2024-10-19T17:03:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-tr-15155-22012\/"},"modified":"2024-10-25T12:38:52","modified_gmt":"2024-10-25T12:38:52","slug":"bsi-pd-iso-tr-15155-22012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-tr-15155-22012\/","title":{"rendered":"BSI PD ISO\/TR 15155-2:2012"},"content":{"rendered":"

This Technical Report is intended to provide guidance on the operation of basic test facilities for irrigation equipment evaluation. Its purpose is to provide information sufficient to implement the detailed procedures included in ISO 7714, ISO 8026, ISO 9261, ISO 9635-1 to 5, ISO 9644, ISO 9911, ISO 10522 and ISO 15886-3, for the testing of agricultural irrigation system components, specifically emitters, sprinklers and valves. The intent is that the structure of this Technical Report can be modified to be used as the operating manual of a test facility established to test the components referred to in these International Standards.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
7<\/td>\nForeword <\/td>\n<\/tr>\n
8<\/td>\n1\tScope
2\tAmendment record
3\tFacility description and functions
3.1\tGeneral
3.2\tTest facility name <\/td>\n<\/tr>\n
9<\/td>\n3.3\tRange of testing
3.4\tOrganizational structure
3.5\tOrganization structure chart
3.6\tStaff
4\tTest facility operating manual (TFOM)
4.1\tIntroduction <\/td>\n<\/tr>\n
10<\/td>\n4.2\tQuality policy
5\tTest facility staff
5.1\tStaff responsibilities
5.2\tTraining and development <\/td>\n<\/tr>\n
11<\/td>\n5.3\tJob descriptions <\/td>\n<\/tr>\n
13<\/td>\n6\tTest facility review and audits
6.1\tTest facility audits
6.2\tReviewing the quality system
6.3\tUpgrading the test facility operating manual (TFOM)
6.4\tUpdating documents <\/td>\n<\/tr>\n
14<\/td>\n6.5\tStandards and procedures
7\tEquipment <\/td>\n<\/tr>\n
15<\/td>\n7.1\tEquipment inventory (example list)
7.2\tEquipment assurance program <\/td>\n<\/tr>\n
16<\/td>\n8\tTest methods
8.1\tElectronic equipment test procedures
8.2\tMechanical equipment test procedures
8.3\tSelection of test methods
8.4\tDepartures from standard test methods
9\tNormal work procedures
9.1\tRequests for testing <\/td>\n<\/tr>\n
17<\/td>\n9.2\tRecording job instructions
9.3\tIdentification and marking of test samples
9.4\tTest data
9.5\tAccess to test area
9.6\tSafety
9.7\tHousekeeping <\/td>\n<\/tr>\n
18<\/td>\n9.8\tImproper influence
10\tControl of test samples
10.1\tReceipt, storage and disposal
10.2\tSecurity of samples
11\tTest records
11.1\tFiling of original test results
11.2\tVerification of data
11.3\tConfidentiality and security
12\tDiagnostic and corrective actions
12.1\tInternal feedback <\/td>\n<\/tr>\n
19<\/td>\n12.2\tExternal feedback
12.3\tVerification procedures
13\tTest reports
13.1\tFormat of test reports
13.2\tCompliance testing
13.3\tChecking of reports <\/td>\n<\/tr>\n
20<\/td>\n13.4\tRevision of reports
13.5\tRetention of reports
14\tSubcontracting responsibilities
15\tOccupational health and safety
15.1\tResponsibilities
15.2\tStaff safety
15.3\tFirst aid and fire-fighting equipment <\/td>\n<\/tr>\n
21<\/td>\n16\tAccreditation: Test facility registration <\/td>\n<\/tr>\n
22<\/td>\nAnnex\u00a0A
\n(informative)<\/p>\n

Typical amendment record <\/td>\n<\/tr>\n

23<\/td>\nAnnex\u00a0B
\n(informative)<\/p>\n

List of reference documents <\/td>\n<\/tr>\n

24<\/td>\nAnnex\u00a0C
\n(informative)<\/p>\n

Facility floor plan <\/td>\n<\/tr>\n

25<\/td>\nAnnex\u00a0D
\n(informative)<\/p>\n

Accident reporting form <\/td>\n<\/tr>\n

26<\/td>\nAnnex\u00a0E
\n(informative)<\/p>\n

Test facility audit topics <\/td>\n<\/tr>\n

28<\/td>\nAnnex\u00a0F
\n(informative)<\/p>\n

Sprayer test bench <\/td>\n<\/tr>\n

32<\/td>\nAnnex\u00a0G
\n(informative)<\/p>\n

Valve test bench <\/td>\n<\/tr>\n

34<\/td>\nAnnex\u00a0H
\n(informative)<\/p>\n

Emitter test bench <\/td>\n<\/tr>\n

36<\/td>\nAnnex\u00a0I
\n(informative)<\/p>\n

Sprinkler test bench <\/td>\n<\/tr>\n

40<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Agricultural irrigation equipment. Test facilities for agricultural irrigation equipment – Test facility operating manual<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2012<\/td>\n42<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":257850,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[932,2641],"product_tag":[],"class_list":{"0":"post-257848","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-65-060-35","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/257848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/257850"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=257848"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=257848"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=257848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}