{"id":408234,"date":"2024-10-20T05:29:40","date_gmt":"2024-10-20T05:29:40","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-61832022\/"},"modified":"2024-10-26T09:59:28","modified_gmt":"2024-10-26T09:59:28","slug":"bs-iso-61832022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-61832022\/","title":{"rendered":"BS ISO 6183:2022"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 3.21 Terms related to occupied and unoccupiable areas <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4 Use and limitations 4.1 General 4.2 Uses for carbon dioxide systems <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.3 Limitations for carbon dioxide systems 4.4 Temperature limitations 5 Safety 5.1 Hazard to personnel <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.2 Safety precautions 5.2.1 Normally occupied and normally unoccupied areas 5.2.2 Warning notices for occupiable areas <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.2.3 Warning notices for unoccupiable areas <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.3 Electrical hazards <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.4 Electrical earthing 5.5 Electrostatic discharge 6 System design 6.1 General 6.1.1 Introduction 6.1.2 Specifications <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.1.3 Working documents 6.2 Carbon dioxide supply 6.2.1 Quality 6.2.2 Quantity <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2.3 Container arrangement <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.2.4 Storage containers <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.3 Distribution 6.3.1 General <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.3.2 Piping 6.3.3 Fittings 6.3.4 Pipe and valve support <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.3.5 Valves 6.3.6 Nozzles <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.4 Enclosures (total flooding) 6.4.1 Structural strength <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.4.2 Loss through openings 6.4.3 Ventilation systems 6.5 Detection, actuation and control systems 6.5.1 General 6.5.2 Shut-down of plant and equipment <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.5.3 Automatic detection 6.5.4 Operating devices <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.5.5 Control equipment <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.5.6 Audible alarms and visual indicators <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 6.6 Local control (LC) and local control stations (LCS) 7 Carbon dioxide flow and concentration calculations 7.1 General 7.2 System flow calculations 7.2.1 General <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 7.2.2 Friction losses 7.2.3 Pressure drop 7.2.4 Valves and fittings 7.2.5 As-installed calculations <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 7.2.6 Specific requirements 7.3 Carbon dioxide concentration requirements 7.3.1 Flame extinguishment 7.3.2 Inerting <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 7.4 Total flooding quantity 7.4.1 General 7.4.2 Design quantity 7.4.3 KB factor <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 7.5 Design of local application systems 7.5.1 General 7.5.2 Carbon dioxide requirements 7.5.3 Rate by area method <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 7.5.4 Rate by volume method <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 7.6 Duration of protection \u2014 total flooding systems <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 7.7 System performance 7.7.1 Discharge time 7.7.2 Extended discharge 8 Commissioning and acceptance 8.1 General 8.2 Tests 8.2.1 General <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 8.2.2 Enclosure check 8.2.3 Review of mechanical components <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 8.2.4 Review of enclosure integrity 8.2.5 Review of electrical components <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 8.2.6 Preliminary functional tests 8.2.7 System functional operational test <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 8.2.8 Remote monitoring operations (if applicable) 8.2.9 Control panel primary power source 8.2.10 Completion of functional tests 8.3 Completion certificate and documentation 9 Inspection, maintenance, testing and training 9.1 General <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 9.2 Inspection 9.2.1 General 9.2.2 Container 9.2.3 Hose 9.2.4 Enclosures 9.3 Maintenance 9.3.1 General <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 9.3.2 User’s programme of inspection 9.3.3 Service schedule 9.4 Training <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Annex A (normative) Working documents <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Annex B (normative) Carbon dioxide system pipe and orifice size determination <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Annex C (informative) System performance verification <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Annex D (informative) General information on carbon dioxide <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Annex E (informative) Examples of calculations <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Fire protection equipment \u2014 Carbon dioxide extinguishing systems for use on premises \u2014 Design and installation<\/b><\/p>\n |