Published By Publication Date Number of Pages
ASME 2016 34
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

B30.7 includes provisions that apply to the construction, installation, operation, inspection, testing and maintenance of winches arranged for mounting on a foundation or other supporting structure for moving loads. Winches addressed in this volume are those typically used in industrial, construction and maritime applications. The requirements included in this volume apply to winches that are powered by internal combustion engines, electric motors, compressed air or hydraulics and that utilize drums and rope. This volume does not apply to overhead hoists, mine hoists, capstans or winches installed as an integral part of the lifting system of other B30 equipment.

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
Figures
5 FOREWORD
7 ASME B30 COMMITTEE ROSTER
9 B30 STANDARD INTRODUCTION
SECTION I: SCOPE
SECTION II: SCOPE EXCLUSIONS
SECTION III: PURPOSE
SECTION IV: USE BY REGULATORY AGENCIES
SECTION V: EFFECTIVE DATE
10 SECTION VI: REQUIREMENTS AND RECOMMENDATIONS
SECTION VII: USE OF MEASUREMENT UNITS
SECTION VIII: REQUESTS FOR REVISION
SECTION IX: REQUESTS FOR INTERPRETATION
SECTION X: ADDITIONAL GUIDANCE
12 SUMMARY OF CHANGES
14 Chapter 7-0 Scope, Definitions, Personnel Competence, and References
SECTION 7-0.1: SCOPE OF B30.7
SECTION 7-0.2: DEFINITIONS
15 SECTION 7-0.3: PERSONNEL COMPETENCE
SECTION 7-0.4: REFERENCES TO OTHER CODES AND STANDARDS
16 Fig. 7-0.2-1 Winch With Capstan
Fig. 7-0.2-2 Single-Drum Winch
Fig. 7-0.2-3 Three-Drum Winch With Attached Swinger
17 Fig. 7-0.2-4 Independent Direct Geared Swinger or Single-Drum Winch
18 Chapter 7-1 Construction and Installation
SECTION 7-1.1: RATINGS AND MARKINGS
7-1.1.1 Basis
7-1.1.2 Winch Ratings
7-1.1.3 Markings
7-1.1.4 Rope Layer Ratings
SECTION 7-1.2: CONSTRUCTION
7-1.2.1 General
7-1.2.2 Winch Mechanisms
7-1.2.3 Brakes
7-1.2.4 Guards
7-1.2.5 Ropes
19 7-1.2.6 Winch Controls
7-1.2.7 Control Forces and Movements
7-1.2.8 Engine Clutch
7-1.2.9 Jaw Clutch
7-1.2.10 Electric Resistors
7-1.2.11 Switches
7-1.2.12 Lubrication
SECTION 7-1.3: INSTALLATION
7-1.3.1 Attachments and Anchorages
7-1.3.2 Installation Location of Winches
20 Chapter 7-2 Inspection, Testing, and Maintenance
SECTION 7-2.1: INSPECTION
7-2.1.1 General
7-2.1.2 Initial Inspection and Test
7-2.1.3 Daily Inspection and Test
7-2.1.4 Frequent Inspection
21 7-2.1.5 Periodic Inspection
7-2.1.6 Winches Not in Regular Service
SECTION 7-2.2: TESTING
7-2.2.1 Operational Tests
7-2.2.2 Load Test
22 SECTION 7-2.3: MAINTENANCE
7-2.3.1 Preventive Maintenance
7-2.3.2 Maintenance Procedure
7-2.3.3 Adjustments and Repairs
7-2.3.4 Lubrication
SECTION 7-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE
7-2.4.1 General
7-2.4.2 Rope Inspection
7-2.4.3 Rope Replacement
23 7-2.4.4 Rope Maintenance
24 Chapter 7-3 Operations
SECTION 7-3.1: QUALIFICATIONS AND CONDUCT OF OPERATORS
7-3.1.1 Operators
7-3.1.2 Qualifications for Operators
7-3.1.3 Responsibilities
25 7-3.1.3.1 Responsibilities of the Equipment Owner and User.
7-3.1.3.1.1
7-3.1.3.1.2
7-3.1.3.2 Responsibilities of Site Supervisor and Lift Director.
7-3.1.3.2.1
26 7-3.1.3.2.2
7-3.1.3.3 Responsibilities of Equipment Operators.
27 7-3.1.3.4 Rigger’s Responsibilities.
7-3.1.4 Cautions to Personnel
SECTION 7-3.2: OPERATING PRACTICES
7-3.2.1 Winch Selection
7-3.2.2 Size of Load
7-3.2.3 Moving the Load
28 7-3.2.4 Holding the Load
7-3.2.5 Use of a Capstan Drum
7-3.2.6 Storage
SECTION 7-3.3: MISCELLANEOUS
7-3.3.1 Fire Extinguisher
7-3.3.2 Refueling
SECTION 7-3.4: COMMUNICATIONS
7-3.4.1 General
7-3.4.2 Standard Signals
29 7-3.4.3 Signalperson Qualifications
7-3.4.4 Standard Hand Signals
7-3.4.5 Standard Voice Signals
7-3.4.6 Special Signals
30 Fig. 7-3.4.4-1 Standard Hand Signals for Controlling Winch Operations