Shopping Cart

No products in the cart.

BS EN 17463:2021

$198.66

Valuation of Energy Related Investments (VALERI)

Published By Publication Date Number of Pages
BSI 2021 62
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 undefined
9 1 Scope
2 Normative references
3 Terms and definitions
12 4 Symbols, abbreviations and subscripts
13 5 Valuation procedure
15 6 Setting up a model (phase A)
6.1 Determination and qualitative description of benefits and efforts
16 6.2 Quantification of the benefits and efforts
17 6.3 Monetisation, determination of the relevant points in time, consideration of price variations and of degradation
6.3.1 General
18 6.3.2 Consideration of price variation effects
6.3.3 Consideration of degradation
20 6.4 Number of periods to be considered
6.5 Consideration of risk
6.6 Determination of the appropriate discount rate
21 7 Calculation (phase B)
7.1 Determination of the NPV of the ERI (most-likely-case scenario)
7.1.1 General
23 7.1.2 Consideration of tax
7.2 Performing a sensitivity analysis under variation of all parameters containing considerable uncertainty
25 7.3 Performing a scenario analysis (best-case, worst-case, and most-likely-case scenario)
26 8 Assessment (phase C)
8.1 Interpretation of the results
8.1.1 General
8.1.2 Net Present Value (NPV)
27 8.1.3 Scenario and sensitivity analyses
8.2 Valuation of non-monetisable qualitative and quantitative effects on the decision
9 Reporting (phase D)
30 Annex A (informative)The NPV calculation table (basic version) with visible formulas
31 Annex B (informative)Comprehensive version of the NPV calculation table
35 Annex C (informative)Selection of the appropriate valuation method
C.1 Objective
C.2 Introduction
C.3 Differentiation between those methods that consider the time value of money and others that donā€™t
37 C.4 Limitations of the Internal Rate of Return method (IRR)
39 C.5 Limitations of the Discounted Payback Period method (DPB or DPP)
42 C.6 Summary
43 Annex D (informative)Case study: Application of the valuation procedure to the integration of a cogeneration unit within an industrial organization
D.1 General
D.2 Determination and qualitative description of all direct and indirect effects
44 D.3 Quantification of the benefits and efforts
46 D.4 Monetisation, determination of the relevant points in time, consideration of price variations and of degradation
47 D.5 Number of periods to be considered
D.6 Determination of the appropriate discount rate
D.7 Consideration of risk
48 D.8 Determination of the value added by the ERI (most-likely-case scenario)
49 D.9 Performing sensitivity analysis under variation of all parameters containing considerable uncertainty
51 D.10 Performing scenario analysis (best-case and worst-case scenario)
D.11 Interpretation of the results
D.12 Transparent and comprehensible presentation of the calculation and the results with consideration of not quantified and not monetised effects
53 Annex E (informative)Checklist for the Valuation Report
55 Annex F (informative)Consideration of risk
58 Annex G (informative)Consideration of price variation
60 Blank Page
BS EN 17463:2021
$198.66