Utility-interconnected photovoltaic inverters. Test procedure for over voltage ride-through measurements

Published By Publication Date Number of Pages
BSI 2021 26
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document provides a test procedure for evaluating the performance of Over Voltage Ride-Through (OVRT) functions in inverters used in utility-interconnected photovoltaic (PV) systems.

This document is most applicable to large systems where PV inverters are connected to utility high voltage (HV) distribution systems. However, the applicable procedures may also be used for low voltage (LV) installations in locations where evolving OVRT requirements include such installations, e.g. single-phase or 3-phase systems.

Fundamentally, the assessed OVRT performance is valid only for the specific configuration and operational mode of the inverter under test. Separate assessment is required for the inverter in other factory or user-settable configurations, as these may cause the inverter OVRT response to behave differently.

The measurement procedures are designed to be as non-site-specific as possible, so that OVRT characteristics measured at one test site, for example, can also be considered valid at other sites.

This document is for testing of PV inverters, though it contains information that may also be useful for testing of a complete PV power plant consisting of multiple inverters connected at a single point to the utility grid. It further provides a basis for utility-interconnected PV inverters numerical simulation and model validation.

PDF Catalog

PDF Pages PDF Title
2 undefined
4 CONTENTS
6 FOREWORD
8 1 Scope
2 Normative references
9 3 Terms, definitions, symbols and abbreviated terms
3.1 Terms, definitions and symbols
12 3.2 Abbreviated terms
4 Test circuit and equipment
4.1 General
4.2 Test circuit
13 4.3 Test equipment
4.3.1 Measuring instruments
4.3.2 DC source
Figures
Figure 1 – Testing circuit diagram
Table 1 – Accuracy of measurements
14 4.3.3 Multi-tap transformer
4.3.4 Grid fault simulator
Figure 2 – RLC-series emulator for three-phase EUT
Figure 3 – RLC-series emulator for single-phase EUT
16 5 Test
5.1 Test protocol
Figure 4 – Converter based emulator for three-phase EUT
Figure 5 – Converter based emulator for single-phase EUT
17 Table 2 – Test specification for OVRT (indicative)
18 5.2 Test curve
5.3 Test procedure
5.3.1 Pre-test
5.3.2 No-load test
5.3.3 Tolerance
Figure 6 – OVRT curve example
19 5.3.4 Load test
6 Assessment criteria
Figure 7 – Tolerance of voltage swell
20 Annex A (informative)Determination of critical performance values in OVRT testing
A.1 General
A.2 Ride-through time
A.3 Voltage swell ratio
Figure A.1 – Critical performance values in OVRT testing
21 A.4 Reactive current
A.5 Active power
22 Annex B (informative)OVRT curve and criteria
B.1 General
B.2 OVRT curve
B.3 Test points
Figure B.1 – Typical curve of OVRT
23 B.4 Criteria
24 Bibliography