{"id":110944,"date":"2024-10-18T16:03:33","date_gmt":"2024-10-18T16:03:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-857-1996\/"},"modified":"2024-10-24T21:59:42","modified_gmt":"2024-10-24T21:59:42","slug":"ieee-857-1996","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-857-1996\/","title":{"rendered":"IEEE 857 1996"},"content":{"rendered":"
Revision Standard – Inactive – Withdrawn. Information and recommendations for the type testing of thyristor valves for high-voltage direct-current (HVDC) power transmission systems are provided. These tests cover only the principal tests on the valves and do not include tests of auxiliary equipment associated with the values.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Scope 2. References <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 4. Classification of tests 4.1 Dielectric tests <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4.2 Operational tests 5. Test requirements 5.1 General <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.2 Valve temperature at testing 5.3 Treatment of redundancy for type tests <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.4 Selection of impulse test withstand voltage levels <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.5 Wet type tests 5.6 Criteria for successful type testing <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.7 Suitability of valve for type test 5.8 Partial discharge measurements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.9 Valve insensitivity to electromagnetic interference <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.10 Test sequence 6. Test program 6.1 Dielectric tests on valve base <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.2 Dielectric tests on an MVU <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.3 Dielectric tests on a valve <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.4 Operational tests on modules <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7. Presentation of test results <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex A\u2014Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Test Procedures for High-Voltage Direct-Current Thyristor Valves<\/b><\/p>\n |