{"id":126662,"date":"2024-10-19T05:39:22","date_gmt":"2024-10-19T05:39:22","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-371752024\/"},"modified":"2024-10-24T23:21:31","modified_gmt":"2024-10-24T23:21:31","slug":"bs-iso-371752024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-371752024\/","title":{"rendered":"BS ISO 37175:2024"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 Benefits to stakeholders 4.1 General <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.2 Authorities 4.3 Investors 4.4 Developers 4.5 Operation providers <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.6 Maintenance providers 4.7 Pipeline operators 4.8 Citizens 5 Basic elements and overall requirements 5.1 General <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.2 Utility tunnel body 5.3 Ancillary facilities 5.4 Pipelines <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.5 Operation and maintenance management platform (OMMP) <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6 Operations and maintenance 6.1 General 6.2 Operations 6.2.1 General 6.2.2 Duty <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.2.3 Detection and monitoring 6.2.4 Routine inspection <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.2.5 Safety operations <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.2.6 Financial management <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.3 Maintenance 6.3.1 General 6.3.2 Requirements 6.4 Management 6.4.1 Emergency management <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.4.2 Data management 6.4.3 Space management <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.4.4 Energy savings and emissions reduction 7 Evaluation and continuous improvement 7.1 General <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 7.2 Sustainability evaluation 7.2.1 Evaluation principles 7.2.2 Evaluation elements 7.3 Continuous improvement 7.3.1 General <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.3.2 Technology improvement 7.3.3 Management improvement 7.3.4 Improvement methods <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Annex A (informative) Evaluation elements <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex B (informative) Application of BIM, GIS and CIM in OMMP <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Smart community infrastructures. Operation and maintenance of utility tunnels<\/b><\/p>\n |