{"id":257861,"date":"2024-10-19T17:03:42","date_gmt":"2024-10-19T17:03:42","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-17458-12013\/"},"modified":"2024-10-25T12:38:57","modified_gmt":"2024-10-25T12:38:57","slug":"bs-iso-17458-12013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-17458-12013\/","title":{"rendered":"BS ISO 17458-1:2013"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
9<\/td>\n | 1 Scope 2 Terms, definitions, symbols and abbreviated terms 2.1 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2.2 Abbreviated terms 3 Conventions 4 Document overview 4.1 General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.2 Document overview and structure 4.3 Open Systems Interconnection (OSI) model <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.4 Document reference according to OSI model <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5 Use case overview and principles 5.1 Basic principles for use case definition 5.2 Use case clusters <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6 FlexRay communications system use case definition 6.1 UC 1 FlexRay processes 6.1.1 UC 1.1 Execute normal communication cycle 6.1.2 UC 1.2 Check for wakeup condition <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.1.3 UC 1.3 Configure communication module 6.1.4 UC 1.4 Clock synchronization <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.1.5 UC 1.5 Start communication module 6.1.6 UC 1.6 Shutdown communication module <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.1.7 UC 1.7 Repeating function & branch error handling 6.2 UC 2 TT modes in clusters 6.2.1 Basic principles for TT mode definition <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2.2 UC 2.1 TT-D cluster <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.2.3 UC 2.2 TT-L cluster <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.2.4 UC 2.3 TT-D cluster linked with a TT-E cluster <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.3 UC 3 Communication protocol 6.3.1 UC 3.1 Flexibility in communication schemes 6.3.2 UC 3.2 Scalable expansion stages <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.3.3 UC 3.3 Suppressible glitches 6.3.4 UC 3.4 Composability <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.3.5 UC 3.5 Synchronisation of application tasks 6.3.6 UC 3.6 Communication controller implementation conformance tests 6.3.7 UC 3.7 Distributed closed loop control application <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.4 UC 4 Electrical physical layer 6.4.1 UC 4.1 Partial networking 6.4.2 UC 4.2 Electrical stress 6.4.3 UC 4.3 ESD protection <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.4.4 UC 4.4 Babbling idiot protection 6.4.5 UC 4.5 Error confinement 6.4.6 UC 4.6 Wake-up during operation <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.4.7 UC 4.7 Adaptable topology <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.4.8 UC 4.8 Bus driver implementation conformance tests <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Blank Page <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Road vehicles. FlexRay communications system – General information and use case definition<\/b><\/p>\n |