{"id":424950,"date":"2024-10-20T06:54:14","date_gmt":"2024-10-20T06:54:14","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-iec-tr-224462017-3\/"},"modified":"2024-10-26T12:59:56","modified_gmt":"2024-10-26T12:59:56","slug":"bsi-pd-iso-iec-tr-224462017-3","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-iec-tr-224462017-3\/","title":{"rendered":"BSI PD ISO\/IEC TR 22446:2017"},"content":{"rendered":"
This document establishes a continual performance improvement (CPI) process that supports service management system (SMS) as defined in the ISO\/IEC 20000 series.<\/p>\n
This process ensures successful deployment and service performance criteria fulfilment.<\/p>\n
This process is based on a predictive performance evaluation method and a related repository.<\/p>\n
This document is not intended to be used as a means of certification and does not add any requirements to those specified in ISO\/IEC 20000\u20111 .<\/p>\n
This document does not provide specific criteria for identifying the need for risk analysis, nor does it specify the types of risk analysis techniques that are used to support a particular technology.<\/p>\n
This document does not offer techniques for implementing the continual performance improvement process.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4 Continual performance improvement of IT enabled services 4.1 Inputs and outputs 4.1.1 Inputs <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.1.2 Outputs <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.2 Process 4.2.1 Description <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.2.2 Process activities <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5 Lifecycle reliability improvement (LCRI) method 5.1 Context 5.2 Set of reliability problems 5.2.1 Classification <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.2.2 Reliability problems <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.3 Correlation between gathered information (for problem resolution) 5.3.1 Context <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.3.2 Risks resulting from transition of new or changed services 5.3.3 Probability of occurrence of a production incident 6 Continual performance improvement repository (CPIR) 6.1 CPIR inputs <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.2 CPIR outputs 6.3 CPIR benefits <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7 Improvement to the ISO\/IEC 20000 series processes 7.1 Improvements <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 7.2 Limits <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Information technology. Continual performance improvement of IT enabled services<\/b><\/p>\n |