{"id":459941,"date":"2024-10-20T10:06:51","date_gmt":"2024-10-20T10:06:51","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iec-61784-5-192024\/"},"modified":"2024-10-26T18:41:06","modified_gmt":"2024-10-26T18:41:06","slug":"bs-en-iec-61784-5-192024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iec-61784-5-192024\/","title":{"rendered":"BS EN IEC 61784-5-19:2024"},"content":{"rendered":"
IEC 61784-5-19:2024 is available as IEC 61784-5-19:2024 RLV<\/span> which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 61784-5-19:2024 specifies the installation profile for CPF 19 (MECHATROLINKTM[1]). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018, IEC 61918:2018\/AMD1:2022 and IEC 61918:2018\/AMD2:2024. [1] MECHATROLINKTM and ?-LINKTM II are trade names of YASKAWA ELECTRIC CORPORATION. This information is given for the convenience of users of this document and does not constitute an endorsement by IEC of the trade names holder or any of its products. Compliance to this profile does not require use of the trade names. Use of the trade name requires permission of the trade name holder.<\/p>\n Industrial networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 19<\/b><\/p>\nPDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 2<\/td>\n undefined <\/td>\n<\/tr>\n \n 5<\/td>\n Annex ZA (normative)Normative references to international publicationswith their corresponding European publications <\/td>\n<\/tr>\n \n 6<\/td>\n English
CONTENTS <\/td>\n<\/tr>\n\n 11<\/td>\n FOREWORD <\/td>\n<\/tr>\n \n 13<\/td>\n INTRODUCTION
Figures
Figure 1 \u2013 Standards relationships <\/td>\n<\/tr>\n\n 14<\/td>\n 1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 CPF19: Overview of installation profiles <\/td>\n<\/tr>\n\n 15<\/td>\n 5 Installation profile conventions <\/td>\n<\/tr>\n \n 16<\/td>\n 6 Conformance to installation profiles <\/td>\n<\/tr>\n \n 17<\/td>\n Annex A (normative) CP 19\/1 (MECHATROLINK\u2122II) specific installation profile
A.1 Installation profile scope
A.2 Normative references
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles <\/td>\n<\/tr>\n\n 18<\/td>\n A.4 Installation planning
A.4.1 General
A.4.2 Planning requirements
A.4.3 Network capabilities <\/td>\n<\/tr>\n\n 19<\/td>\n Figure A.1 \u2013 Topology of CP 19\/1 network
Figure A.2 \u2013 Network expansion using repeater <\/td>\n<\/tr>\n\n 20<\/td>\n A.4.4 Selection and use of cabling components
Tables
Table A.1 \u2013 Basic network characteristics for balanced cabling not based on Ethernet
Table A.2 \u2013 Number of devices and maximum segment length <\/td>\n<\/tr>\n\n 21<\/td>\n Table A.3 \u2013 Information relevant to copper cable: fixed cables
Table A.4 \u2013 Additional cable specifications <\/td>\n<\/tr>\n\n 22<\/td>\n Figure A.3 \u2013 Structure of cable
Table A.5 \u2013 Connectors for copper cabling CPs not based on Ethernet <\/td>\n<\/tr>\n\n 23<\/td>\n Figure A.4 \u2013 Dimensions of single port device connector <\/td>\n<\/tr>\n \n 24<\/td>\n Figure A.5 \u2013 Dimensions of dual ports device connector
Figure A.6 \u2013 Dimensions of cable connector <\/td>\n<\/tr>\n\n 25<\/td>\n Figure A.7 \u2013 Cable connector with inductors <\/td>\n<\/tr>\n \n 26<\/td>\n Figure A.8 \u2013 Terminator connection in cable connector housing <\/td>\n<\/tr>\n \n 28<\/td>\n A.4.5 Cabling planning documentation
A.4.6 Verification of cabling planning specification
A.5 Installation implementation
A.5.1 General requirements
A.5.2 Cable installation <\/td>\n<\/tr>\n\n 29<\/td>\n Table A.6 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n \n 30<\/td>\n A.5.3 Connector installation
Figure A.9 \u2013 Wiring example
Table A.7 \u2013 Pin assignment and wire colour coding for CP 19\/1 connector <\/td>\n<\/tr>\n\n 31<\/td>\n A.5.4 Terminator installation
A.5.5 Device installation
A.5.6 Coding and labelling
A.5.7 Earthing and bonding of equipment and devices and shield cabling
A.5.8 As-implemented cabling documentation
Figure A.10 \u2013 Terminator installed in MII cable connector <\/td>\n<\/tr>\n\n 32<\/td>\n A.6 Installation verification and installation acceptance test
A.6.1 General
A.6.2 Installation verification <\/td>\n<\/tr>\n\n 33<\/td>\n A.6.3 Installation acceptance test
A.7 Installation administration <\/td>\n<\/tr>\n\n 34<\/td>\n A.8 Installation maintenance and installation troubleshooting
A.8.1 General
A.8.2 Maintenance
A.8.3 Troubleshooting
A.8.4 Specific requirements for maintenance and troubleshooting
Table A.8 \u2013 Typical problems in a network with balanced cabling <\/td>\n<\/tr>\n\n 35<\/td>\n Figure A.11 \u2013 Division of network segment by changing terminator location <\/td>\n<\/tr>\n \n 36<\/td>\n Annex B (normative) CP 19\/2 (MECHATROLINK\u2122III) specific installation profile
B.1 Installation profile scope
B.2 Normative references
B.3 Installation profile terms, definitions, and abbreviated terms
B.3.1 Terms and definitions
B.3.2 Abbreviated terms
B.3.3 Conventions for installation profiles
B.4 Installation planning
B.4.1 General
B.4.2 Planning requirements <\/td>\n<\/tr>\n\n 37<\/td>\n B.4.3 Network capabilities <\/td>\n<\/tr>\n \n 38<\/td>\n B.4.4 Selection and use of cabling components
Table B.1 \u2013 Network characteristics for balanced cabling based on Ethernet <\/td>\n<\/tr>\n\n 39<\/td>\n Table B.2 \u2013 Information relevant to copper cable: fixed cables
Table B.3 \u2013 Information relevant to copper cable: cords <\/td>\n<\/tr>\n\n 40<\/td>\n Table B.4 \u2013 Connectors for balanced cabling CPs based on Ethernet <\/td>\n<\/tr>\n \n 43<\/td>\n B.4.5 Cabling planning documentation
B.4.6 Verification of cabling planning specification
B.5 Installation implementation
B.5.1 General requirements
B.5.2 Cable installation
Table B.5 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n\n 44<\/td>\n B.5.3 Connector installation <\/td>\n<\/tr>\n \n 45<\/td>\n B.5.4 Terminator installation
B.5.5 Device installation
B.5.6 Coding and labelling
B.5.7 Earthing and bonding of equipment and devices and shield cabling
B.5.8 As-implemented cabling documentation
Table B.6 \u2013 Pin assignment and wire colour coding for CP 19\/2 modular and IMI connector
Table B.7 \u2013 Pin assignment and wire colour coding for CP 19\/2 M12 connector <\/td>\n<\/tr>\n\n 46<\/td>\n B.6 Installation verification and installation acceptance test
B.6.1 General
B.6.2 Installation verification <\/td>\n<\/tr>\n\n 47<\/td>\n B.6.3 Installation acceptance test
B.7 Installation administration
B.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n\n 48<\/td>\n Annex C (normative) CP19\/3 ((-LINK\u2122 II) specific installation profile
C.1 Installation profile scope
C.2 Normative references
C.3 Installation profile terms, definitions, and abbreviated terms
C.3.1 Terms and definitions
C.3.2 Abbreviated terms
C.3.3 Conventions for installation profiles
C.4 Installation planning
C.4.1 General
C.4.2 Planning requirements <\/td>\n<\/tr>\n\n 49<\/td>\n C.4.3 Network capabilities
Figure C.1 \u2013 Topology of CP 19\/3 combination of linear and T-branch network <\/td>\n<\/tr>\n\n 50<\/td>\n C.4.4 Selection and use of cabling components
Figure C.2 \u2013 Topology of CP 19\/3 network example with Power adaptor
Table C.1 \u2013 Basic network characteristics for balanced cabling not based on Ethernet <\/td>\n<\/tr>\n\n 51<\/td>\n Table C.2 \u2013 Information relevant to 6-conductor copper cable <\/td>\n<\/tr>\n \n 52<\/td>\n Table C.3 \u2013 Information relevant to 8-conductor copper cable
Table C.4 \u2013 Additional cable specifications <\/td>\n<\/tr>\n\n 53<\/td>\n Figure C.3 \u2013 Structure of 6-conductor cable
Figure C.4 \u2013 Structure of 8-conductor cable <\/td>\n<\/tr>\n\n 54<\/td>\n Figure C.5 \u2013 Connection for linear network
Table C.5 \u2013 Connectors for copper cabling CPs not based on Ethernet <\/td>\n<\/tr>\n\n 55<\/td>\n Figure C.6 \u2013 Dimensions of device 6 pin connector
Figure C.7 \u2013 Dimensions of device 6 pin connector <\/td>\n<\/tr>\n\n 56<\/td>\n Figure C.8 \u2013 Dimensions of device 6 pin connector
Figure C.9 \u2013 Dimensions of device 8 pin male connector <\/td>\n<\/tr>\n\n 57<\/td>\n Figure C.10 \u2013 Dimensions of ejector for device 8 pin male connector
Figure C.11 \u2013 Dimensions of device 8 pin female connector <\/td>\n<\/tr>\n\n 58<\/td>\n Figure C.12 \u2013 Dimensions of cable 6 pin male connector
Figure C.13 \u2013 Dimensions of cable 6 pin female connector
Figure C.14 \u2013 Dimensions of cable 8 pin male connector <\/td>\n<\/tr>\n\n 59<\/td>\n Figure C.15 \u2013 Dimensions of cable 8 pin female connector
Table C.6 \u2013 Electric characteristics of 6pin connector
Table C.7 \u2013 Electric characteristics of 8pin connector <\/td>\n<\/tr>\n\n 62<\/td>\n C.4.5 Cabling planning documentation
C.4.6 Verification of cabling planning specification
C.5 Installation implementation
C.5.1 General requirements <\/td>\n<\/tr>\n\n 63<\/td>\n C.5.2 Cable installation
Table C.8 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n\n 64<\/td>\n C.5.3 Connector installation
Table C.9 \u2013 Pin assignment and wire colour coding for CP 19\/3 6 pin connector
Table C.10 \u2013 Pin assignment and wire colour coding for CP 19\/3 8 pin connector <\/td>\n<\/tr>\n\n 65<\/td>\n C.5.4 Terminator installation
C.5.5 Device installation
C.5.6 Coding and labelling
C.5.7 Earthing and bonding of equipment and devices and shield cabling
C.5.8 As-implemented cabling documentation
C.6 Installation verification and installation acceptance test
C.6.1 General
C.6.2 Installation verification <\/td>\n<\/tr>\n\n 66<\/td>\n C.6.3 Installation acceptance test <\/td>\n<\/tr>\n \n 67<\/td>\n C.7 Installation administration
C.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n\n 68<\/td>\n Annex D (normative) CP 19\/4 (MECHATROLINK\u21224) specific installation profile
D.1 Installation profile scope
D.2 Normative references
D.3 Installation profile terms, definitions, and abbreviated terms
D.3.1 Terms and definitions
D.3.2 Abbreviated terms
D.3.3 Conventions for installation profiles
D.4 Installation planning
D.4.1 General
D.4.2 Planning requirements <\/td>\n<\/tr>\n\n 69<\/td>\n D.4.3 Network capabilities <\/td>\n<\/tr>\n \n 70<\/td>\n D.4.4 Selection and use of cabling components
Table D.1 \u2013 Network characteristics for balanced cabling based on Ethernet <\/td>\n<\/tr>\n\n 71<\/td>\n Table D.2 \u2013 Information relevant to copper cable: CP 19\/4 type A fixed cables
Table D.3 \u2013 Information relevant to copper cable: CP 19\/4 type B fixed cables <\/td>\n<\/tr>\n\n 72<\/td>\n Table D.4 \u2013 Information relevant to copper cable: CP 19\/4 type A fixed cords
Table D.5 \u2013 Information relevant to copper cable: CP 19\/4 type B fixed cords <\/td>\n<\/tr>\n\n 73<\/td>\n Table D.6 \u2013 Connectors for balanced cabling CPs based on Ethernet <\/td>\n<\/tr>\n \n 76<\/td>\n D.4.5 Cabling planning documentation
D.4.6 Verification of cabling planning specification
D.5 Installation implementation
D.5.1 General requirements
D.5.2 Cable installation <\/td>\n<\/tr>\n\n 77<\/td>\n Table D.7 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n \n 78<\/td>\n D.5.3 Connector installation
Table D.8 \u2013 Pin assignment and wire colour coding for CP 19\/4 modular and IMI connector
Table D.9 \u2013 Pin assignment and wire colour coding for CP 19\/4 M12-4 connector
Table D.10 \u2013 Pin assignment and wire colour coding for CP 19\/4 M12-8 connector <\/td>\n<\/tr>\n\n 79<\/td>\n D.5.4 Terminator installation
D.5.5 Device installation
D.5.6 Coding and labelling
D.5.7 Earthing and bonding of equipment and devices and shield cabling
D.5.8 As-implemented cabling documentation
D.6 Installation verification and installation acceptance test
D.6.1 General
D.6.2 Installation verification <\/td>\n<\/tr>\n\n 80<\/td>\n D.6.3 Installation acceptance test <\/td>\n<\/tr>\n \n 81<\/td>\n D.7 Installation administration
D.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n\n 82<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" \n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2024<\/td>\n 84<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":459951,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[385,2641],"product_tag":[],"class_list":{"0":"post-459941","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-25-040-40","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/459941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/459951"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=459941"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=459941"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=459941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}