{"id":697235,"date":"2024-11-06T05:46:39","date_gmt":"2024-11-06T05:46:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/wrc-volume-38-no-081983\/"},"modified":"2024-11-06T05:46:39","modified_gmt":"2024-11-06T05:46:39","slug":"wrc-volume-38-no-081983","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/wrc\/wrc-volume-38-no-081983\/","title":{"rendered":"WRC volume 38 No. 08:1983"},"content":{"rendered":"

Contents<\/b><\/p>\n

– Executive Committee & Attachments, January 26, 1983
– Steering Committee on Piping Systems, January 24, 1983
– Technical Committee on Piping Systems, January 21-22, 1983
– Materials Division, January 26, 1983
– Subcommittee on Pressure Vessel Steels, January 25, 1983
– Subcommittee on Failure Modes in Pressure Vessel Materials, January 24, 1983
– Subcommittee on Nondestructive Examination of Pressure Components, January 25, 1983
– Subcommittee on Hydrogen Effects, January 25, 1983
– Design Division, January 26, 1983
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, January 25, 1983
– Task Group on Dynamic Stress Criteria, January 25, 1983
– Subcommittee on Elevated Temperature Design, January 26, 1983
– Task Group Long-Range Planning, January 25, 1983
– Joint Task Group on Elevated Temperature Behavior of Bolted Flanges, January 24, 1983
– Task Group on Pipe Reactions on Pumps, January 24, 1983
– Task Group on Piping System Interaction Studies Tasks #1 & #3, January 25, 1983
– Subcommittee on Shells & Ligaments, January 25, 1983
– Subcommittee on Bolted Flanged Components, January 25, 1983
– Task Group on Gasket Testing, January 25, 1983
– Subcommittee on Reinforced Openings and External Loads, January 24, 1983
– Task Group on Laterals, January 24, 1983
– Fabrication Division, January 25, 1983
– Subcommittee on Significance of Weld Discontinuities, January 24, 1983
– Subcommittee on Thermal and Mechanical Effects, January 24, 1983
– Subcommittee on Thermal and Mechanical Effects, September 28, 1982
– Subcommittee on Cyclic and Creep Behavior of Components, January 24, 1983
– PVRC Survey to Investigate Influence of Pipe Reactions on Pumps
– Request for Damping Data
– PVRC Future Meeting Dates<\/p>\n","protected":false},"excerpt":{"rendered":"

Progress Reports Volume 38 No. 08<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
WRC<\/b><\/a><\/td>\n1983<\/td>\n106<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":697245,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2677],"product_tag":[],"class_list":{"0":"post-697235","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-wrc","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/697235","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/697245"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=697235"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=697235"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=697235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}