Shopping Cart

No products in the cart.

2008 ASHRAE Handbook HVAC SytemsandEquipment Chapter5

$45.50

HVAC Sytems and Equipment Handbook – Chapter 5. In-Room Terminal Systems

Published By Publication Date Number of Pages
ASHRAE 2008 16
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
1 System Characteristics
System Characteristics
2 Heating and Cooling Calculations
Heating and Cooling Calculations
Space Heating
Space Heating
Central Ventilation Systems
Central Ventilation Systems
Piping Distribution
Piping Distribution
Other Considerations
Other Considerations
First, Operating, and Maintenance Costs
First, Operating, and Maintenance Costs
3 Energy
Energy
System Components and Configurations
System Components and Configurations
Components
Components
Configurations
Configurations
Piping Arrangements
Piping Arrangements
Four-Pipe Distribution
Four-Pipe Distribution
4 Fig. 1 Typical Fan-Coil Unit Arrangements
Fig. 1 Typical Fan-Coil Unit Arrangements
Fig. 1 Typical Fan-Coil Arrangements
Fig. 1 Typical Fan-Coil Arrangements
Two-Pipe Distribution
Two-Pipe Distribution
Three-Pipe Distribution
Three-Pipe Distribution
Fan-Coil Unit Systems
Fan-Coil Unit Systems
5 Fig. 2 Typical Fan-Coil Unit
Fig. 2 Typical Fan-Coil Unit
Fig. 2 Typical Fan-Coil Unit
Fig. 2 Typical Fan-Coil Unit
Types and Location
Types and Location
Ventilation Air Requirements
Ventilation Air Requirements
Selection
Selection
Wiring
Wiring
Condensate
Condensate
6 Capacity Control
Capacity Control
Maintenance
Maintenance
Unit Ventilator Systems
Unit Ventilator Systems
Types and Location
Types and Location
Ventilation Air Requirements
Ventilation Air Requirements
Selection
Selection
Wiring
Wiring
7 Condensate
Condensate
Capacity Control
Capacity Control
Maintenance
Maintenance
Chilled-Beam Systems
Chilled-Beam Systems
Types and Location
Types and Location
Ventilation Air Requirements
Ventilation Air Requirements
Selection
Selection
Wiring
Wiring
Condensate
Condensate
Capacity Control
Capacity Control
Maintenance
Maintenance
8 Radiant-Panel Heating Systems
Radiant-Panel Heating Systems
Types and Location
Types and Location
Ventilation Air Requirements
Ventilation Air Requirements
Selection
Selection
Wiring
Wiring
Capacity Control
Capacity Control
Maintenance
Maintenance
Other Radiant Panel Options
Other Radiant Panel Options
Radiant-Floor Heat Systems
Radiant-Floor Heat Systems
Types and Location
Types and Location
Ventilation Air Requirements
Ventilation Air Requirements
Selection
Selection
Wiring
Wiring
Capacity Control
Capacity Control
Maintenance
Maintenance
Induction-Unit Systems
Induction-Unit Systems
9 Supplemental Heating Units
Supplemental Heating Units
Central Plant Equipment
Central Plant Equipment
Ventilation
Ventilation
Fig. 3 IP
Fig. 3 IP
Fig. 3 Ventilation from Separate Duct System
Fig. 3 Ventilation from Separate Duct System
10 Primary-Air Systems
Primary-Air Systems
Fig. 4 Primary-air System
Fig. 4 Primary-air System
Fig. 4 Primary-Air System
Fig. 4 Primary-Air System
Performance Under Varying Load
Performance Under Varying Load
11 Fig. 5 Solar Radiation Variations with Seasons
Fig. 5 Solar Radiation Variations with Seasons
Fig. 5 Solar Radiation Variations with Seasons
Fig. 5 Solar Radiation Variations with Seasons
Changeover Temperature
Changeover Temperature
Refrigeration Load
Refrigeration Load
12 Two-Pipe Systems with Central Ventilation
Two-Pipe Systems with Central Ventilation
Fig. 6 IP
Fig. 6 IP
Fig. 6 Capacity Ranges of In-Room Terminal Operating on Two-Pipe System
Fig. 6 Capacity Ranges of In-Room Terminal Operating on Two-Pipe System
Critical Design Elements
Critical Design Elements
13 Fig. 7 IP
Fig. 7 IP
Fig. 7 Primary-Air Temperature Versus Outside Air Temperature
Fig. 7 Primary-Air Temperature Versus Outside Air Temperature
Changeover Temperature Considerations
Changeover Temperature Considerations
Fig. 8 IP
Fig. 8 IP
Fig. 8 Psychrometric Chart, Two-Pipe System, Off-Season Cooling
Fig. 8 Psychrometric Chart, Two-Pipe System, Off-Season Cooling
Fig. 9 IP
Fig. 9 IP
Fig. 9 Typical Changeover System Temperature Variation
Fig. 9 Typical Changeover System Temperature Variation
Nonchangeover Design
Nonchangeover Design
14 Fig. 10 IP
Fig. 10 IP
Fig. 10 Typical Nonchangeover System Variations
Fig. 10 Typical Nonchangeover System Variations
Zoning
Zoning
Room Control
Room Control
Evaluation
Evaluation
Electric Heat for Two-Pipe Systems
Electric Heat for Two-Pipe Systems
Four-Pipe Systems
Four-Pipe Systems
15 Fig. 11 Fan Coil Unit Control
Fig. 11 Fan Coil Unit Control
Fig. 11 Fan-Coil Unit Control
Fig. 11 Fan-Coil Unit Control
Zoning
Zoning
Room Control
Room Control
Evaluation
Evaluation
Secondary-Water Distribution
Secondary-Water Distribution
Automatic Controls and Building Management Systems
Automatic Controls and Building Management Systems
16 Maintenance Management Systems
Maintenance Management Systems
Building System Commissioning
Building System Commissioning
References
References
Bibliography
Bibliography
2008 ASHRAE Handbook HVAC SytemsandEquipment Chapter5
$45.50