2008 ASHRAE Handbook HVAC SytemsandEquipment Chapter5
$45.50
HVAC Sytems and Equipment Handbook – Chapter 5. In-Room Terminal Systems
Published By | Publication Date | Number of Pages |
ASHRAE | 2008 | 16 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | System Characteristics System Characteristics |
2 | Heating and Cooling Calculations Heating and Cooling Calculations Space Heating Space Heating Central Ventilation Systems Central Ventilation Systems Piping Distribution Piping Distribution Other Considerations Other Considerations First, Operating, and Maintenance Costs First, Operating, and Maintenance Costs |
3 | Energy Energy System Components and Configurations System Components and Configurations Components Components Configurations Configurations Piping Arrangements Piping Arrangements Four-Pipe Distribution Four-Pipe Distribution |
4 | Fig. 1 Typical Fan-Coil Unit Arrangements Fig. 1 Typical Fan-Coil Unit Arrangements Fig. 1 Typical Fan-Coil Arrangements Fig. 1 Typical Fan-Coil Arrangements Two-Pipe Distribution Two-Pipe Distribution Three-Pipe Distribution Three-Pipe Distribution Fan-Coil Unit Systems Fan-Coil Unit Systems |
5 | Fig. 2 Typical Fan-Coil Unit Fig. 2 Typical Fan-Coil Unit Fig. 2 Typical Fan-Coil Unit Fig. 2 Typical Fan-Coil Unit Types and Location Types and Location Ventilation Air Requirements Ventilation Air Requirements Selection Selection Wiring Wiring Condensate Condensate |
6 | Capacity Control Capacity Control Maintenance Maintenance Unit Ventilator Systems Unit Ventilator Systems Types and Location Types and Location Ventilation Air Requirements Ventilation Air Requirements Selection Selection Wiring Wiring |
7 | Condensate Condensate Capacity Control Capacity Control Maintenance Maintenance Chilled-Beam Systems Chilled-Beam Systems Types and Location Types and Location Ventilation Air Requirements Ventilation Air Requirements Selection Selection Wiring Wiring Condensate Condensate Capacity Control Capacity Control Maintenance Maintenance |
8 | Radiant-Panel Heating Systems Radiant-Panel Heating Systems Types and Location Types and Location Ventilation Air Requirements Ventilation Air Requirements Selection Selection Wiring Wiring Capacity Control Capacity Control Maintenance Maintenance Other Radiant Panel Options Other Radiant Panel Options Radiant-Floor Heat Systems Radiant-Floor Heat Systems Types and Location Types and Location Ventilation Air Requirements Ventilation Air Requirements Selection Selection Wiring Wiring Capacity Control Capacity Control Maintenance Maintenance Induction-Unit Systems Induction-Unit Systems |
9 | Supplemental Heating Units Supplemental Heating Units Central Plant Equipment Central Plant Equipment Ventilation Ventilation Fig. 3 IP Fig. 3 IP Fig. 3 Ventilation from Separate Duct System Fig. 3 Ventilation from Separate Duct System |
10 | Primary-Air Systems Primary-Air Systems Fig. 4 Primary-air System Fig. 4 Primary-air System Fig. 4 Primary-Air System Fig. 4 Primary-Air System Performance Under Varying Load Performance Under Varying Load |
11 | Fig. 5 Solar Radiation Variations with Seasons Fig. 5 Solar Radiation Variations with Seasons Fig. 5 Solar Radiation Variations with Seasons Fig. 5 Solar Radiation Variations with Seasons Changeover Temperature Changeover Temperature Refrigeration Load Refrigeration Load |
12 | Two-Pipe Systems with Central Ventilation Two-Pipe Systems with Central Ventilation Fig. 6 IP Fig. 6 IP Fig. 6 Capacity Ranges of In-Room Terminal Operating on Two-Pipe System Fig. 6 Capacity Ranges of In-Room Terminal Operating on Two-Pipe System Critical Design Elements Critical Design Elements |
13 | Fig. 7 IP Fig. 7 IP Fig. 7 Primary-Air Temperature Versus Outside Air Temperature Fig. 7 Primary-Air Temperature Versus Outside Air Temperature Changeover Temperature Considerations Changeover Temperature Considerations Fig. 8 IP Fig. 8 IP Fig. 8 Psychrometric Chart, Two-Pipe System, Off-Season Cooling Fig. 8 Psychrometric Chart, Two-Pipe System, Off-Season Cooling Fig. 9 IP Fig. 9 IP Fig. 9 Typical Changeover System Temperature Variation Fig. 9 Typical Changeover System Temperature Variation Nonchangeover Design Nonchangeover Design |
14 | Fig. 10 IP Fig. 10 IP Fig. 10 Typical Nonchangeover System Variations Fig. 10 Typical Nonchangeover System Variations Zoning Zoning Room Control Room Control Evaluation Evaluation Electric Heat for Two-Pipe Systems Electric Heat for Two-Pipe Systems Four-Pipe Systems Four-Pipe Systems |
15 | Fig. 11 Fan Coil Unit Control Fig. 11 Fan Coil Unit Control Fig. 11 Fan-Coil Unit Control Fig. 11 Fan-Coil Unit Control Zoning Zoning Room Control Room Control Evaluation Evaluation Secondary-Water Distribution Secondary-Water Distribution Automatic Controls and Building Management Systems Automatic Controls and Building Management Systems |
16 | Maintenance Management Systems Maintenance Management Systems Building System Commissioning Building System Commissioning References References Bibliography Bibliography |