BS 5546:2000 2005
$167.15
Specification for installation of hot water supplies for domestic purposes, using gas-fired appliances of rated input not exceeding 70 kW
Published By | Publication Date | Number of Pages |
BSI | 2005 | 50 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | BRITISH STANDARD |
2 | Committees responsible for this British Standard |
3 | Contents |
7 | 1 Scope 2 Normative references |
8 | 3 Terms and definitions air vent back circulator unit circulator cistern cold feed pipe combination boiler compartment condensing appliance direct cylinder indirect cylinder double-feed indirect cylinder single-feed indirect cylinder |
9 | distributing pipe domestic water draining tap feed cistern float-operated valve flow pipe flueless appliance hot water storage combination unit hot water storage vessel instantaneous water heater |
10 | open-flued appliance primary circuit return pipe room-sealed appliance secondary circuit servicing valve stop valve storage water heater storage system vent pipe warning pipe water-jacketed tube heater |
11 | 4 Selection of equipment and pre-installation 4.1 Exchange of information and planning 4.2 Selection of water heating appliance and system |
13 | 4.3 Condensing appliances |
17 | 4.4 ” Materials and components 5 Installation 5.1 Design |
18 | Connection of condensate drainage pipe to soil and vent stack |
19 | Connection of a condensate drainage pipe downstream of a sink waste trap |
20 | Connection of a condensate drainage pipe upstream of a sink waste trap |
21 | External termination of condensate drainage pipe |
22 | Example of a purpose-made soakaway |
26 | Circulator installation in cylinder/airing cupboard |
27 | 5.2 Water supply |
28 | Example of a cistern conforming to 5.2.2.1 |
29 | Examples showing the clear space needed above storage cisterns |
30 | Maximum lengths of uninsulated hot water pipes Vertical distance between draw-off tap and spillover level |
32 | 5.3 Gas supply 5.4 Electricity supply 5.5 Installation of instantaneous water heaters |
33 | Typical large instantaneous water heater installation on cistern supply 5.6 Installation of combination boilers 5.7 Installation of vented storage water heaters |
34 | 5.8 Installation of unvented storage systems of capacity exceeding 15 l |
35 | Example of an indirect unvented (vented primary) storage system |
36 | 5.9 Circulator installations |
37 | Typical direct circulating system 5.10 Boiler installations |
38 | Temporary connection to primary circuit 5.11 Water-jacketed tube heater installations |
39 | 5.12 Open-vented systems |
40 | Typical indirect circulating system |
43 | 5.13 Showers |
45 | 6 Post-installation 6.1 Inspection 6.2 Commissioning |
46 | 6.3 Advice to user |
47 | (informative) CORGI registration and competency (informative) CORGI registration and competency |