BS EN 13160-5:2016
$215.11
Leak detection systems – Requirements and test/assessment methods for in-tank gauge systems and pressurised pipework systems
Published By | Publication Date | Number of Pages |
BSI | 2016 | 78 |
This European Standard gives requirements and corresponding testassessment methods applicable to leak detection kits, based on volumetric loss from within the tank and/or pipework system. The kits usually comprise:
-
Measuring Device
-
Evaluation Device
-
Alarm Device
Intended use:
Leak Detection kits are intended to be used inwith single or double skin underground tanks or single or double skin underground and/or aboveground pipework designed for flammable liquids having a flash point not exceeding 100 °C.
PDF Catalog
PDF Pages | PDF Title |
---|---|
8 | 1 Scope 2 Normative references |
9 | 3 Terms, definitions, symbols and abbreviated terms 3.1 Terms and definitions 3.2 Symbols and abbreviated terms 4 Requirements 4.1 Effectiveness of leak detection kits 4.1.1 General |
10 | 4.1.2 Electrical or signal cable of the measuring device 4.1.3 Leak detection kit 4.1.4 Measures volumetric loss 4.1.4.1 General |
11 | 4.1.4.2 Category A – Dynamic leak detection 4.1.4.3 Category B (1) – Static leak detection 4.1.4.4 Category B (2) – Statistical quiet period detection – Type 2 4.1.4.5 Category C – Pressure line leak detection – Type 1 4.1.4.6 Category C – Pressure line leak detection – Type 2 4.1.4.7 Category C – Pressure line leak detection – Type 3 4.1.5 Requirements for software |
12 | 4.1.6 Mechanical construction 4.1.7 Effects of thermal contraction 4.1.8 Alarm device 4.2 Durability of effectiveness 4.2.1 Durability of effectiveness against temperature 4.2.2 Durability of effectiveness against chemical attack 4.2.3 Durability of effectiveness against hydraulic shock (only for measuring devices used on pressurized line) 4.2.4 Durability of effectiveness against fatigue and mechanical weardegradation, (only for measuring devices used on pressurized line) 4.2.5 Durability of effectiveness against microbiological growth on critical surfaces involved in the measurement process |
13 | 5 Testing, assessment and sampling methods 5.1 Effectiveness of leak detection kits 5.1.1 General 5.1.2 Disconnection of the electrical or signal cable of the measuring device 5.1.3 Leak detection kit 5.1.4 Measures volumetric loss 5.1.4.1 General 5.1.4.2 Category A – Dynamic leak detection |
17 | 5.1.4.3 Category B(1) – Static leak detection |
18 | 5.1.4.4 Category B(2) – Statistical quiet period detection |
20 | 5.1.4.5 Category C – Pressure line leak detection |
27 | 5.1.5 Software 5.1.5.1 Test equipment 5.1.5.2 Preparation 5.1.5.3 Test method 5.1.5.4 Evaluation 5.1.6 Mechanical construction |
28 | 5.1.7 Effects of thermal contraction 5.1.8 Alarm Device 5.1.8.1 Test equipment 5.1.8.2 Preparation 5.1.8.3 Test method 5.1.8.4 Evaluation 5.2 Durability of Effectiveness 5.2.1 Durability of effectiveness against temperature 5.2.2 Durability of effectiveness against chemical attack 5.2.2.1 Category A and category B 5.2.2.2 Category C |
30 | 5.2.3 Durability of effectiveness against hydraulic shock (only for measuring devices used on pressurized line) 5.2.4 Durability of effectiveness against fatigue and mechanical weardegradation, (only for measuring devices used on pressurized line) 5.2.4.1 Test Equipment 5.2.4.2 Preparation 5.2.4.3 Procedure |
31 | 5.2.4.4 Evaluation 5.2.5 Durability of effectiveness against microbiological growth on critical surfaces involved in the measurement process 6 Assessment and verification of constancy of performance — AVCP 6.1 General 6.2 Type testing 6.2.1 General |
32 | 6.2.2 Test samples, testing and compliance criteria 6.2.3 Test reports |
33 | 6.2.4 Shared other party results 6.2.5 Cascading determination of the product type results |
34 | 6.3 Factory production control (FPC) 6.3.1 General |
35 | 6.3.2 Requirements 6.3.2.1 General |
36 | 6.3.2.2 Equipment 6.3.2.3 Raw materials and components 6.3.2.4 Traceability and marking 6.3.2.5 Controls during manufacturing process 6.3.2.6 Product testing and evaluation 6.3.2.7 Non-complying products |
37 | 6.3.2.8 Corrective action 6.3.2.9 Handling, storage and packaging 6.3.3 Product specific requirements |
38 | 6.3.4 Procedure for modifications 6.3.5 One-off products, pre-production products (e.g. prototypes) and products produced in very low quantity |
39 | 7 Marking, labelling and packaging |