Shopping Cart

No products in the cart.

IEEE STD 515 2004

$45.50

IEEE Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Heat Tracing for Industrial Applications

Published By Publication Date Number of Pages
IEEE 2004 75
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 Title page
Title page
4 Introduction
Introduction
Participants
Participants
6 Contents
Contents
8 1. Overview
1. Overview
1.1 Scope
1.1 Scope
9 1.2 Purpose
1.2 Purpose
2. References
2. References
3. Definitions
3. Definitions
13 4. General product testing
4. General product testing
4.1 Type test—General purpose tests
4.1 Type test—General purpose tests
21 4.2 Type test—verification of sheath temperatures
4.2 Type test—verification of sheath temperatures
23 4.3 Specific type test requirements for hazardous (classified) locations
4.3 Specific type test requirements for hazardous (classified) locations
25 4.4 Routine tests
4.4 Routine tests
26 5. Marking and installation instructions
5. Marking and installation instructions
5.1 Product markings for heating devices
5.1 Product markings for heating devices
5.2 Markings for field-assembled components
5.2 Markings for field-assembled components
27 5.3 Installation Instructions
5.3 Installation Instructions
6. Design
6. Design
6.1 Process considerations
6.1 Process considerations
28 6.2 Environmental/site considerations
6.2 Environmental/site considerations
6.3 Thermal insulation and heat-loss considerations
6.3 Thermal insulation and heat-loss considerations
32 6.4 Maximum temperature determination
6.4 Maximum temperature determination
34 6.5 Stabilized and controlled designs
6.5 Stabilized and controlled designs
35 6.6 Design information
6.6 Design information
37 6.7 Power system
6.7 Power system
38 6.8 Special considerations
6.8 Special considerations
41 6.9 Control and monitoring considerations
6.9 Control and monitoring considerations
44 6.10 Division 1 and Zone 1 design requirements
6.10 Division 1 and Zone 1 design requirements
45 6.11 Safety shower design requirements
6.11 Safety shower design requirements
7. Installation
7. Installation
7.1 Personnel
7.1 Personnel
7.2 Receiving and storage of materials
7.2 Receiving and storage of materials
46 7.3 Scheduling of installation
7.3 Scheduling of installation
7.4 General installation recommendations
7.4 General installation recommendations
47 7.5 Special Division 1 and Zone 1 installation requirements
7.5 Special Division 1 and Zone 1 installation requirements
49 7.6 Controls and sensors
7.6 Controls and sensors
7.7 Cable testing after installation
7.7 Cable testing after installation
7.8 Thermal insulation—Recommendations
7.8 Thermal insulation—Recommendations
50 7.9 Functional check and field documentation—Recommendations
7.9 Functional check and field documentation—Recommendations
51 8. Maintenance
8. Maintenance
8.1 General maintenance recommendations
8.1 General maintenance recommendations
8.2 Division 1/Zone 1 maintenance recommendations
8.2 Division 1/Zone 1 maintenance recommendations
8.3 Visual inspection
8.3 Visual inspection
8.4 Periodic operational check
8.4 Periodic operational check
52 8.5 Record keeping
8.5 Record keeping
53 Annex A—Bibliography
Annex A—Bibliography
55 Annex B—Pipe heat-loss considerations
Annex B—Pipe heat-loss considerations
61 Annex C—Vessel heat-loss considerations
Annex C—Vessel heat-loss considerations
65 Annex D—Heat-up considerations
Annex D—Heat-up considerations
67 Annex E—Method to determine equivalent thicknesses of insulating cements
Annex E—Method to determine equivalent thicknesses of insulating cements
68 Annex F—Type test matrix for Clause 4
Annex F—Type test matrix for Clause 4
70 Annex G—Design basic data—Example (see 6.6)
Annex G—Design basic data—Example (see 6.6)
71 Annex H—Heater installation record—Example (see 7.2.2)
Annex H—Heater installation record—Example (see 7.2.2)
72 Annex I—Division 1/Zone 1—Checklist example (see 7.5)
Annex I—Division 1/Zone 1—Checklist example (see 7.5)
73 Annex J—Heater commissioning record—Example (see 7.9)
Annex J—Heater commissioning record—Example (see 7.9)
74 Annex K—Maintenance log record—Example (see 8.5.3)
Annex K—Maintenance log record—Example (see 8.5.3)
IEEE STD 515 2004
$45.50