Shopping Cart

No products in the cart.

ACI ITG 4.1 07:2007 Edition

$25.73

ITG-4.1-07 Specification for High-Strength Concrete in Moderate to High Seismic Applications

Published By Publication Date Number of Pages
ACI 2007 16
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This specification is a reference specification that the licensed design professional can make applicable to any construction project by citing it in the project specifications. The licensed design professional supplements the provisions of this reference specification as needed by designating or specifying individual project requirements. This specification covers cast-in-place, normalweight, high-strength concrete in structures that must be designed for moderate to high seismic applications. More specifically, this specification applies to structures: – Located in Seismic Zones 2, 3, or 4 defined by the Uniform Building Code; – Assigned to Seismic Performance Categories C, D, or E of the BOCA/ National Building Code (1993 and subsequent editions) or the Standard Building Code (1994 or subsequent editions); or – Seismic Design Categories C, D, E or F of the International Building Code or the National Fire Protection Association (NFPA) 5000 Building Construction and Safety Code. Irrespective of seismic hazard, seismic performance, or design category, these requirements shall apply to normalweight, high-strength concrete in intermediate or special moment frames and intermediate or special structural walls. Keywords: curing; high-strength concrete; mixture proportioning; placement; quality control; seismic application; temperature; trial batch.

PDF Catalog

PDF Pages PDF Title
3 NOTES TO SPECIFIER
NOTES TO SPECIFIER
PREFACE
PREFACE
P1
P1
P2
P2
P3
P3
P4
P4
P5
P5
4 CONTENTS
CONTENTS
SECTION 1— GENERAL REQUIREMENTS
SECTION 1— GENERAL REQUIREMENTS
1.1— Scope
1.1— Scope
1.1.1 General
1.1.1 General
1.1.2 Supplemental specification
1.1.2 Supplemental specification
1.1.3 High-strength concrete
1.1.3 High-strength concrete
1.1.4 Dual units
1.1.4 Dual units
1.2—Definitions
1.2—Definitions
5 1.3—Referenced standards and cited publications
1.3—Referenced standards and cited publications
1.3.1 Referenced standards
1.3.1 Referenced standards
1.3.1.1 ACI standards
1.3.1.1 ACI standards
1.3.1.2 ASTM standards
1.3.1.2 ASTM standards
6 1.3.2 Cited publications
1.3.2 Cited publications
1.4—Organizations producing codes and standards
1.4—Organizations producing codes and standards
SECTION 2— MATERIALS
SECTION 2— MATERIALS
2.1— General
2.1— General
2.1.1 Description
2.1.1 Description
2.1.2 Submittals
2.1.2 Submittals
2.1.2.1
2.1.2.1
2.1.2.2
2.1.2.2
2.2—Products
2.2—Products
2.2.1 Fine aggregates
2.2.1 Fine aggregates
2.2.2 Chemical admixtures
2.2.2 Chemical admixtures
2.3—Execution
2.3—Execution
SECTION 3— MIXTURE PROPORTIONING AND TRIAL BATCHES
SECTION 3— MIXTURE PROPORTIONING AND TRIAL BATCHES
3.1— General
3.1— General
3.1.1 Description
3.1.1 Description
3.1.2 Submittals
3.1.2 Submittals
3.1.2.2 Trial batch tests
3.1.2.2 Trial batch tests
3.1.2.3 Field verification tests
3.1.2.3 Field verification tests
3.1.3 Mixture proportions
3.1.3 Mixture proportions
7 3.1.4 Field verification tests
3.1.4 Field verification tests
3.2—Products
3.2—Products
3.3—Execution
3.3—Execution
3.3.1
3.3.1
3.3.2
3.3.2
3.3.3
3.3.3
3.3.4
3.3.4
SECTION 4— MIXTURE SUBMITTAL REQUIREMENTS
SECTION 4— MIXTURE SUBMITTAL REQUIREMENTS
4.1— General
4.1— General
4.1.1 Description
4.1.1 Description
4.1.2 Submittals
4.1.2 Submittals
4.1.3 Approval of mixture proportions
4.1.3 Approval of mixture proportions
4.2—Products
4.2—Products
4.3—Execution
4.3—Execution
SECTION 5— PRECONSTRUCTION MEEETINGS
SECTION 5— PRECONSTRUCTION MEEETINGS
5.1— General
5.1— General
5.1.1 Description
5.1.1 Description
5.1.2 Coordination with construction
5.1.2 Coordination with construction
5.2—Products
5.2—Products
5.3—Execution
5.3—Execution
SECTION 6— ORDERING
SECTION 6— ORDERING
6.1— General
6.1— General
6.2—Products
6.2—Products
6.3—Execution
6.3—Execution
6.3.1
6.3.1
6.3.2
6.3.2
6.3.3
6.3.3
8 SECTION 7— PRODUCTION AND DELIVERY
SECTION 7— PRODUCTION AND DELIVERY
7.1— General
7.1— General
7.1.1 Description
7.1.1 Description
7.1.2 Production and delivery requirements
7.1.2 Production and delivery requirements
7.2—Products
7.2—Products
7.3—Execution
7.3—Execution
7.3.1 Mixing
7.3.1 Mixing
7.3.2 Washing trucks
7.3.2 Washing trucks
7.3.3 Automatic measurement of moisture content
7.3.3 Automatic measurement of moisture content
7.3.4 Measuring moisture content during production
7.3.4 Measuring moisture content during production
7.3.5 Moisture content records
7.3.5 Moisture content records
7.3.6 Rinsing trucks
7.3.6 Rinsing trucks
7.3.7 Batch tickets
7.3.7 Batch tickets
7.3.8 Delivery tickets
7.3.8 Delivery tickets
7.3.9 Addition of water
7.3.9 Addition of water
7.3.10 Mixing time
7.3.10 Mixing time
SECTION 8— CONCRETE TEMPERATURE CONTROL
SECTION 8— CONCRETE TEMPERATURE CONTROL
8.1— General
8.1— General
8.2—Products
8.2—Products
9 8.3—Execution
8.3—Execution
8.3.1 Hot weather concrete placement temperature
8.3.1 Hot weather concrete placement temperature
8.3.2 Cold weather concreting
8.3.2 Cold weather concreting
8.3.2.1
8.3.2.1
8.3.2.2
8.3.2.2
SECTION 9— PLACEMENT
SECTION 9— PLACEMENT
9.1— General
9.1— General
9.1.1 Description
9.1.1 Description
9.1.2 Submittals
9.1.2 Submittals
9.2—Products
9.2—Products
9.3—Execution
9.3—Execution
9.3.1 Placement upon delivery
9.3.1 Placement upon delivery
9.3.2 Placing equipment
9.3.2 Placing equipment
9.3.3 Depositing concrete
9.3.3 Depositing concrete
9.3.4 Concrete of different strengths
9.3.4 Concrete of different strengths
9.3.5 Addition of water
9.3.5 Addition of water
9.3.6 Addition of admixtures
9.3.6 Addition of admixtures
9.3.7 Consolidation
9.3.7 Consolidation
SECTION 10— CURING
SECTION 10— CURING
10.1—General
10.1—General
10.1.1 Description
10.1.1 Description
10.1.2 Submittals
10.1.2 Submittals
10.2—Products
10.2—Products
10.3—Execution
10.3—Execution
10.3.1 Commencement of curing
10.3.1 Commencement of curing
10.3.2 Temperature control
10.3.2 Temperature control
10 10.3.3 Mass concrete
10.3.3 Mass concrete
SECTION 11— SAMPLING AND TESTING
SECTION 11— SAMPLING AND TESTING
11.1— General
11.1— General
11.1.1 Description
11.1.1 Description
11.1.2 Submittals
11.1.2 Submittals
11.2—Products
11.2—Products
11.3—Execution
11.3—Execution
11.3.1 Materials
11.3.1 Materials
11.3.1.1 Testing standards
11.3.1.1 Testing standards
11.3.1.2 Sampling frequency
11.3.1.2 Sampling frequency
11.3.2 Concrete
11.3.2 Concrete
11.3.2.1 Testing fresh concrete
11.3.2.1 Testing fresh concrete
11.3.2.2 Strength testing
11.3.2.2 Strength testing
NOTES TO SPECIFIERS
NOTES TO SPECIFIERS
Foreword to checklists
Foreword to checklists
F1
F1
F2
F2
F3
F3
F4
F4
F5
F5
F6
F6
F7
F7
11 MANDATORY REQUIREMENTS CHECKLIST
MANDATORY REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
12 OPTIONAL REQUIREMENTS CHECKLIST (cont.)
OPTIONAL REQUIREMENTS CHECKLIST (cont.)
SUBMITTALS CHECKLIST
SUBMITTALS CHECKLIST
ACI ITG 4.1 07
$25.73