Shopping Cart

No products in the cart.

ASHRAE Guide SmallMedOffice 2019

$63.38

ASHRAE Advanced Energy Design Guide for Small to Medium Office Buildings – Achieving Zero Energy

Published By Publication Date Number of Pages
ASHRAE 2019 240
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

None

PDF Catalog

PDF Pages PDF Title
6 Contents
10 Sidebars and Case Studies
12 Acknowledgments
14 Abbreviations and Acronyms
16 Foreword
18 Chapter 1 – Introduction
GOALS OF THIS GUIDE
19 ZERO ENERGY DEFINITION
20 BENEFITS OF A ZERO ENERGY OFFICE BUILDING
ENVIRONMENTAL STEWARDSHIP AND CORPORATE IMAGE
OCCUPANT SATISFACTION
SOUND FISCAL MANAGEMENT
21 SCOPE
22 DEVELOPING THE GUIDE
23 HOW TO USE THIS GUIDE
25 REFERENCES AND RESOURCES
26 Case Study – Bullitt Center
28 Case Study – Boulder Commons
30 Chapter 2 – Principles for Success
IMPROVING BUILDING PERFORMANCE
31 MOVING TO ZERO ENERGY
32 FUNDAMENTAL PROJECT SUCCESS FACTORS
35 PLANNING FOR ZERO ENERGY SUCCESS
37 MAINTAINING ZERO ENERGY GOALS THROUGHOUT A PROJECT
38 PLANNING FOR THE FUTURE
TECHNOLOGY
RESILIENCY
40 GRID ALIGNMENT
REFERENCES AND RESOURCES
41 Case Study – Cincinnati District 3 Polic HQ
44 Chapter 3 – A Process for Success
ESTABLISHING A ZERO ENERGY PROCESS
45 SET THE GOAL
SELECT A PROCUREMENT PROCESS
46 HIRE THE PROJECT TEAM
47 INCORPORATE THE GOAL IN THE OPR AND BOD
48 MAINTAIN ZERO ENERGY THROUGH DESIGN
DETERMINE THE EUI TARGET
49 VERIFY ZERO ENERGY AT EACH STEP OF DESIGN
52 SUPPORT ZERO ENERGY IN ONGOING OPERATION
CONFIRM ZERO ENERGY THROUGH COMMISSIONING
53 COMMISSIONING FOR ZERO ENERGY SYSTEMS
55 VERIFY ZERO ENERGY IN EARLY OPERATION
TRACK ZERO ENERGY FOR THE LONG TERM
56 EDUCATE AND ENGAGE BUILDING OCCUPANTS
REFERENCES
57 Case Study – NREL RSF
60 Chapter 4 – Building Performance Simulation
INTRODUCTION
61 TECHNICAL APPROACH TO ACHIEVE A ZERO ENERGY BUILDING
63 DESIGN PROCESS TO IDENTIFY AND IMPLEMENT STRATEGIES
64 CONCEPT PHASE
65 SCHEMATIC DESIGN
66 DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
CONSTRUCTION PHASE
OPERATIONS PHASE
67 BUILDING SYSTEMS STRATEGIES
CLIMATE
68 FORM AND SHAPE
WINDOW-TO-WALL RATIO
69 SHADING
70 ENVELOPE
USER BEHAVIOR
71 EQUIPMENT SCHEDULES AND LOADS
LIGHTING
NATURAL VENTILATION
72 INFILTRATION
DAYLIGHTING
73 HEATING AND COOLING LOADS
MECHANICAL SYSTEMS COMPARISONS
RENEWABLE ENERGY SYSTEMS
74 REFERENCES AND RESOURCES
75 Case Study – The 300 Building
76 Case Study – CMTA Inc. Lexington Office
78 Chapter 5 – How-To Strategies
79 Table 5-1 Summary of Strategies and Recommendations
81 BUILDING AND SITE PLANNING
OVERVIEW
SITE DESIGN STRATEGIES
82 BUILDING MASSING
87 BUILDING ORIENTATION
88 BUILDING DESIGN STRATEGIES
91 PLANNING FOR RENEWABLE ENERGY
97 REFERENCES
ENVELOPE
OVERVIEW
98 THERMAL PERFORMANCE OF OPAQUE ASSEMBLIES
104 THERMAL PERFORMANCE OF FENESTRATION AND DOORS
112 AIR LEAKAGE CONTROL
113 THERMAL BRIDGING CONTROL
122 REFERENCES AND RESOURCES
127 DAYLIGHTING
OVERVIEW
DESIGN STRATEGIES
137 SPACE-SPECIFIC STRATEGIES
141 REFERENCES
142 LIGHTING CONTROLS
DESIGN STRATEGIES
150 REFERENCES AND RESOURCES
ELECTRIC LIGHTING
INTERIOR LIGHTING
DESIGN STRATEGIES
152 SPACE-SPECIFIC STRATEGIES
158 EXTERIOR LIGHTING
160 REFERENCES AND RESOURCES
PLUG LOADS AND POWER DISTRIBUTION SYSTEMS
OVERVIEW
161 PLUG LOAD MANAGEMENT
164 EQUIPMENT SELECTION
166 BUILDING PROCESS LOADS
167 POWER DISTRIBUTION SYSTEMS
168 REFERENCES AND RESOURCES
169 SERVICE WATER HEATING
OVERVIEW
171 DESIGN STRATEGIES
174 REFERENCES AND RESOURCES
175 HVAC SYSTEMS AND EQUIPMENT
OVERVIEW
SYSTEM A—ROOFTOP MULTIZONE VAV WITH HYDRONIC HEATING (SMALL OFFICE ONLY)
178 SYSTEM B—AIR-SOURCE VRF HEAT PUMP WITH DOAS
182 SYSTEM C—WATER AND GSHP WITH DOAS
188 SYSTEM D—DOAS WITH SENSIBLE FAN-COILS AND CHILLERS WITH WATERSIDE ECONOMIZERS
191 DEDICATED OUTDOOR AIR SYSTEMS
203 HVAC TIPS FOR ALL SYSTEM TYPES
211 THERMAL MASS
213 REFERENCES
214 RENEWABLE ENERGY
OVERVIEW
217 DESIGN STRATEGIES
222 IMPLEMENTATION STRATEGIES
224 REFERENCES AND RESOURCES
225 Case Study – DPR Constr. Retrofits
230 Appendix A – Envelope Thermal Performance Factors
232 Appendix B – International Climatic Zone Definitions
236 Appendix C – Quantifying Thermal Transmittance Impacts of Thermal Bridges
ASHRAE Guide SmallMedOffice 2019
$63.38