BS ISO/IEC/IEEE 29119-3:2021
$215.11
Software and systems engineering. Software testing – Test documentation
Published By | Publication Date | Number of Pages |
BSI | 2021 | 100 |
This document specifies software test documentation templates that can be used for any organization, project or testing activity. It describes the test documentation that is an output of the processes specified in ISO/IEC/IEEE 29119-2 .
This document is applicable to testing in all software development lifecycle models. This document is intended for, but not limited to, testers, test managers, developers, and project managers, particularly those responsible for governing, managing, and implementing software testing.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
9 | Foreword |
10 | Introduction |
13 | 1 Scope 2 Normative references 3 Terms and definitions |
17 | 4 Conformance 4.1 Intended usage 4.1.1 General 4.1.2 Full conformance 4.1.3 Tailored conformance |
18 | 5 Common information for all test documentation 5.1 Overview 5.2 Common information elements 5.2.1 Unique identifier 5.2.2 Issuing organization 5.2.3 Approval authority 5.2.4 Change history 5.2.5 Status 5.2.6 Introduction |
19 | 5.2.7 Scope 5.2.8 References 5.2.9 Glossary 6 Organizational test process documentation 6.1 Overview 6.2 Test policy 6.2.1 Overview 6.2.2 Objectives of testing |
20 | 6.2.3 Test process 6.2.4 Test organization structure 6.2.5 Tester training 6.2.6 Tester ethics 6.2.7 Standards 6.2.8 Other relevant policies 6.2.9 Measuring the value of testing 6.2.10 Test asset archiving and reuse 6.2.11 Test process improvement 6.3 Organizational test practices 6.3.1 Overview |
21 | 6.3.2 Organization-level test practice statements |
22 | 6.3.3 Test level/type-specific organizational test practice statements |
24 | 7 Test management processes documentation 7.1 Overview 7.2 Test plan 7.2.1 Overview 7.2.2 Context of testing |
25 | 7.2.3 Assumptions and constraints 7.2.4 Stakeholders 7.2.5 Testing communication 7.2.6 Risk register |
26 | 7.2.7 Test strategy |
28 | 7.2.8 Testing activities and estimates 7.2.9 Staffing |
29 | 7.2.10 Schedule 7.3 Test status report 7.3.1 Overview 7.3.2 Test status |
30 | 7.3.3 Reporting period 7.3.4 Progress against test plan 7.3.5 Factors blocking progress 7.3.6 Test measures 7.3.7 New and changed risks 7.3.8 Planned testing 7.4 Test completion report 7.4.1 Overview 7.4.2 Summary of testing performed 7.4.3 Deviations from planned testing |
31 | 7.4.4 Test completion evaluation 7.4.5 Factors that blocked progress 7.4.6 Test measures 7.4.7 Residual risks 7.4.8 Test deliverables 7.4.9 Reusable test assets 7.4.10 Lessons learned 8 Dynamic test processes documentation 8.1 Overview |
32 | 8.2 Test model specification 8.2.1 Overview 8.2.2 Unique identifier 8.2.3 Objective |
33 | 8.2.4 Priority 8.2.5 Test strategy extract 8.2.6 Test model 8.2.7 Traceability 8.3 Test case specification 8.3.1 Overview 8.3.2 Test coverage items |
34 | 8.3.3 Test cases |
35 | 8.4 Test procedure specification 8.4.1 Overview |
36 | 8.4.2 Unique identifier 8.4.3 Objective 8.4.4 Priority 8.4.5 Start up 8.4.6 Ordered test cases 8.4.7 Relationship to other procedures 8.4.8 Stop and wrap up 8.5 Test data requirements 8.5.1 Overview |
37 | 8.5.2 Unique identifier 8.5.3 Description 8.5.4 Responsibility 8.5.5 Period needed 8.5.6 Resetting needs 8.5.7 Archiving or disposal 8.6 Test environment requirements 8.6.1 Overview |
38 | 8.6.2 Unique identifier 8.6.3 Test environment item 8.6.4 Description 8.6.5 Responsibility 8.6.6 Period needed |
39 | 8.7 Test data readiness report 8.7.1 Overview 8.7.2 Unique identifier 8.7.3 Description of status 8.8 Test environment readiness report 8.8.1 Overview 8.8.2 Unique identifier 8.8.3 Description of status 8.9 Actual results and test result 8.9.1 General |
40 | 8.9.2 Actual results 8.9.3 Test result 8.10 Test execution log 8.10.1 Overview |
41 | 8.10.2 Unique identifier 8.10.3 Date/time 8.10.4 Description 8.10.5 Impact 8.11 Test incident report 8.11.1 Overview 8.11.2 Timing information 8.11.3 Originator |
42 | 8.11.4 Context 8.11.5 Description of the incident 8.11.6 Originator’s assessment of severity 8.11.7 Originator’s assessment of priority 8.11.8 Risk 8.11.9 Status of the incident |
43 | Bibliography |
44 | IEEE Notices and Abstract |
48 | Annex A (normative) ISO/IEC/IEEE 29119‑3 requirements, recommendations and permissions |
53 | Annex B (informative) Overview of examples |
55 | Annex C (informative) Test policy |
57 | Annex D (informative) Organizational test practices |
62 | Annex E (informative) Test plan |
70 | Annex F (informative) Test status report |
74 | Annex G (informative) Test completion report |
76 | Annex H (informative) Test model specification |
78 | Annex I (informative) Test case specification |
80 | Annex J (informative) Test procedure specification |
82 | Annex K (informative) Test data requirements |
83 | Annex L (informative) Test environment requirements |
84 | Annex M (informative) Test data readiness report |
86 | Annex O (informative) Actual results |
87 | Annex P (informative) Test result |
89 | Annex Q (informative) Test execution log |
90 | Annex R (informative) Incident report |
92 | Annex S (informative) Mappings to IEEE 829:2008 (superseded) |
98 | Annex T (informative) Test models |