IEEE C37.30.6-2023
$30.33
IEEE Guide for Electric Motor Operators Applied to High‐Voltage Air Switches Rated Above 1000 V (Approved Draft)
Published By | Publication Date | Number of Pages |
IEEE | 2023 |
New IEEE Standard – Active. Construction, application, and testing considerations for electric motor operators and accessories for use with high-voltage switches and interrupter switches rated above 1000V, as covered in IEEE Std. C37.30.1 and Std C37.30.3 are provided.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
8 | Participants |
9 | Introduction |
10 | Contents |
12 | 1. Overview 1.1 Scope 1.2 Purpose 1.3 Word usage subclause |
13 | 2. Normative references 3. Definitions |
14 | 4. Common motor operator mechanisms |
15 | 5. Service conditions 5.1 Usual service conditions 5.1.1 Indoor Subclause 3.2.1 of IEEE Std C37.100.1-2018 applies. 5.1.2 Outdoor 5.2 Special (unusual) service conditions |
16 | 6. Typical ratings 6.1 Control voltage 6.2 Mechanical operations |
17 | 6.3 Enclosure rating 6.4 Locked rotor 6.5 Rated torque 7. Construction 7.1 Motor 7.2 Enclosure 7.3 Gear train 7.4 Motor control |
18 | 7.5 Mechanism wiring 7.5.1 Wiring types 7.5.2 Terminations 7.5.3 Wiring across a hinge 7.6 Terminal blocks 7.7 Surge protection 7.8 Environmental control |
19 | 7.9 Mechanical performance 7.9.1 Torsional 7.9.2 Reciprocating 7.9.3 Direct drive (switch level control) |
20 | 7.9.4 Braking 7.9.5 Manual operation 7.9.6 Decoupler 7.10 Auxiliary switch |
21 | 7.11 Control 7.11.1 Main operator control 7.11.2 Customer control 7.11.2.1 Remote terminal unit (RTU) 7.11.2.2 Communication method |
22 | 7.12 Motor protection 7.13 Nameplate |
23 | 7.14 Provisions 7.14.1 Interlock 7.14.2 Grounding 7.15 Stored energy 7.15.1 Batteries 7.15.2 Types of batteries and associated chargers |
24 | 7.15.2.1 Sizing 7.16 Options |
25 | 7.17 Packaging 7.17.1 Shipping considerations 7.17.2 Types of storage 7.17.3 Battery storage 7.17.4 Loose parts and accessories 7.17.5 Labeling 7.17.6 Included documentation |
26 | 7.18 Documentation 7.18.1 Documentation types 7.18.2 Documentation formats 7.18.3 Electronic file transfers 7.19 Spare part recommendations 8. Testing 8.1 Mechanical operations 8.1.1 Test arrangement |
27 | 8.1.2 Number of operations 8.1.3 Time between operations 8.1.4 Control voltage 8.1.5 Loading 8.1.6 Motor operator maintenance during test 8.1.7 Criteria for acceptance 8.2 Locked rotor |
28 | 8.2.1 Test arrangement 8.2.1.1 Torsional and direct drive 8.2.1.2 Reciprocating 8.2.2 Supply voltage 8.2.3 Duration 8.2.4 Criteria for acceptance 8.3 Enclosure testing 9. Routine testing |
29 | 9.1 Control wiring continuity 9.2 Control wiring insulation test 9.3 Auxiliary switch dielectric testing 9.4 Electrical operations test 9.5 Final verification |
30 | Annex A (informative)Bibliography |