{"id":111114,"date":"2024-10-18T16:06:07","date_gmt":"2024-10-18T16:06:07","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1378-1997\/"},"modified":"2024-10-24T22:00:21","modified_gmt":"2024-10-24T22:00:21","slug":"ieee-1378-1997","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1378-1997\/","title":{"rendered":"IEEE 1378 1997"},"content":{"rendered":"
New IEEE Standard – Active. General guidelines for commissioning high-voltage direct-current (HVDC) convert stations and associated transmission systems are provided. These quidelines apply to HVDC systems utilizing 6-pulse or 12-pulse thyristor-valve converter units operated as a two-terminal HVDC transmission system or an HVDC back-to-back system.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction Parfticipants <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Overview <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 2. References <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3. Definitions and acronyms <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4. General <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5. Off-site tests <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6. On-site precommissioning <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7. On-site subsystem testing <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8. On-site converter station tests <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 9. On-site transmission testing <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 10. On-site trial operation <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 11. On-site acceptance tests <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 12. Documentation <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex A–Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Commissioning High-Voltage Direct-Current (HVDC) Converter Stations and Associated Transmission Systems<\/b><\/p>\n |