{"id":182756,"date":"2024-10-19T11:26:13","date_gmt":"2024-10-19T11:26:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/cdc-designconstructionstandards-2018\/"},"modified":"2024-10-25T03:47:39","modified_gmt":"2024-10-25T03:47:39","slug":"cdc-designconstructionstandards-2018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/cdc\/cdc-designconstructionstandards-2018\/","title":{"rendered":"CDC DesignConstructionStandards 2018"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | REVISION HISTORY: (MOST RECENT RELEASE LISTED FIRST) <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | TABLE OF CONTENTS <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 1 INTRODUCTION 1 THE CENTERS FOR DISEASE CONTROL AND PREVENTION 2 THE GOAL 3 PURPOSE OF GUIDELINES <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 4 ORGANIZATION OF THE GUIDELINES <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 2 POLICY 2.0 Introduction <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 2.1 Administration of the Reference Guidelines <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 2.2 Codes and Standards <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 2.3 Accessibility <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 2.4 Sustainable Design and High Performance Building Guidelines <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 2.5 Furniture & Equipment Design and Procurement <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 2.6 Commissioning Policy <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | 2.7 Hazardous Materials Policy <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 2.8 Energy Policy <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | 2.9 Water Management Policy <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 2.10 Dispatch of Loads <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | 2.11 Value Engineering <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | 3 PROCEDURES 3.0 Introduction <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | 3.1 CDC General Drawing Requirements (CAD <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | 3.2 Drawing Requirements <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | 3.3 Existing Condition Facility Documentation <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | 3.4 Numbering Systems <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 3.5 Furniture Procurement <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | 3.6 Commissioning <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 3.7 Hazardous Materials 3.8 Health and Safety 3.9 Operating and Maintenance Manuals <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | 4 PLANNING AND DESIGN GUIDELINES 4.0 Introduction <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | 4.1 General Planning Criteria <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 4.1.1 Master Plan <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | 4.1.2 Environmental Health and Safety <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 4.1.3 Security <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | 4.1.4 Civil & Site Development Guidelines <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | 4.1.5 Campus Mechanical <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | 4.1.6 Campus Electrical <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | 4.1.7 Building Shell <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | 4.1.8 General Facilities <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | 4.2 General Laboratory Planning <\/td>\n<\/tr>\n | ||||||
175<\/td>\n | 4.2.1 Biological Laboratories <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | 4.2.2 Chemical Laboratories <\/td>\n<\/tr>\n | ||||||
181<\/td>\n | 4.2.3 Engineering Laboratories <\/td>\n<\/tr>\n | ||||||
183<\/td>\n | 4.2.4 Radiation Laboratories <\/td>\n<\/tr>\n | ||||||
186<\/td>\n | 4.3 General Animal Facility Planning <\/td>\n<\/tr>\n | ||||||
197<\/td>\n | 4.3.1 Primate Facilities <\/td>\n<\/tr>\n | ||||||
200<\/td>\n | 4.3.2 Rodent Facilities <\/td>\n<\/tr>\n | ||||||
202<\/td>\n | 4.3.3 Canine Facilities <\/td>\n<\/tr>\n | ||||||
204<\/td>\n | 4.3.4 Insect Facilities <\/td>\n<\/tr>\n | ||||||
208<\/td>\n | 4.3.4a Flying Insect Facilities (Mosquitoes <\/td>\n<\/tr>\n | ||||||
212<\/td>\n | 4.3.4b Crawling Insect Facilities (Ticks, Mites, Lice, Fleas <\/td>\n<\/tr>\n | ||||||
214<\/td>\n | 4.4 Office Planning <\/td>\n<\/tr>\n | ||||||
219<\/td>\n | 4.5 Support Facilities Planning 4.5.0 Building Support Facilities <\/td>\n<\/tr>\n | ||||||
220<\/td>\n | 4.5.1 Conference Facilities With Videoconferencing <\/td>\n<\/tr>\n | ||||||
232<\/td>\n | 4.5.2 Cafeterias <\/td>\n<\/tr>\n | ||||||
234<\/td>\n | 4.5.3 Break Rooms <\/td>\n<\/tr>\n | ||||||
237<\/td>\n | 4.5.4 Vending Areas <\/td>\n<\/tr>\n | ||||||
239<\/td>\n | 4.5.5 Snack Bars <\/td>\n<\/tr>\n | ||||||
241<\/td>\n | 4.5.6 Travel Office <\/td>\n<\/tr>\n | ||||||
243<\/td>\n | 4.5.7 Share (Employee Store <\/td>\n<\/tr>\n | ||||||
245<\/td>\n | 4.5.8 Credit Union <\/td>\n<\/tr>\n | ||||||
247<\/td>\n | 4.5.9 Lifestyle Facilities <\/td>\n<\/tr>\n | ||||||
253<\/td>\n | 4.5.10 Lobby Areas <\/td>\n<\/tr>\n | ||||||
255<\/td>\n | 4.5.11 Toilet Facilities <\/td>\n<\/tr>\n | ||||||
259<\/td>\n | 4.5.12 Stairwells <\/td>\n<\/tr>\n | ||||||
262<\/td>\n | 4.5.13 Janitor Closets <\/td>\n<\/tr>\n | ||||||
264<\/td>\n | 4.5.14 Mechanical Rooms <\/td>\n<\/tr>\n | ||||||
267<\/td>\n | 4.5.15 Electrical Switchgear Rooms (Main Service Entrance <\/td>\n<\/tr>\n | ||||||
271<\/td>\n | 4.5.16 Electrical Rooms <\/td>\n<\/tr>\n | ||||||
275<\/td>\n | 4.5.17 Telephone Equipment Rooms (PBX <\/td>\n<\/tr>\n | ||||||
281<\/td>\n | 4.5.18 Telecommunication\/LAN Rooms <\/td>\n<\/tr>\n | ||||||
286<\/td>\n | 4.5.19 Lactation Rooms <\/td>\n<\/tr>\n | ||||||
287<\/td>\n | 4.5.20 Campus Support Facilities <\/td>\n<\/tr>\n | ||||||
288<\/td>\n | 4.5.21 Central Utility Plants <\/td>\n<\/tr>\n | ||||||
292<\/td>\n | 4.5.22 Data Processing Facilities <\/td>\n<\/tr>\n | ||||||
297<\/td>\n | 4.5.23 Transshipping Facilities <\/td>\n<\/tr>\n | ||||||
300<\/td>\n | 4.5.24 Laboratory Chemical Storage Facilities <\/td>\n<\/tr>\n | ||||||
303<\/td>\n | 4.5.25 Waste Handling Facilities <\/td>\n<\/tr>\n | ||||||
306<\/td>\n | 4.5.26 Parking Facilities <\/td>\n<\/tr>\n | ||||||
310<\/td>\n | 4.5.27 Integrated Facilities Management System (IFMS <\/td>\n<\/tr>\n | ||||||
315<\/td>\n | 4.5.28 Stationary Storage Battery System Rooms <\/td>\n<\/tr>\n | ||||||
322<\/td>\n | 5 BUILDING ELEMENTS <\/td>\n<\/tr>\n | ||||||
323<\/td>\n | 5A SUBSTRUCTURE 5A0 Introduction <\/td>\n<\/tr>\n | ||||||
324<\/td>\n | 5A1 Foundations 5A1.10 Standard Foundations <\/td>\n<\/tr>\n | ||||||
325<\/td>\n | 5A1.20 Special Foundations <\/td>\n<\/tr>\n | ||||||
327<\/td>\n | 5A1.30 Slab On Grade <\/td>\n<\/tr>\n | ||||||
329<\/td>\n | 5A2 Below Grade Construction 5A2.10 Below Grade Excavations <\/td>\n<\/tr>\n | ||||||
330<\/td>\n | 5A2.20 Below Grade Walls <\/td>\n<\/tr>\n | ||||||
331<\/td>\n | 5B SHELL 5B.0 Introduction <\/td>\n<\/tr>\n | ||||||
332<\/td>\n | 5B1.10 Floor Construction <\/td>\n<\/tr>\n | ||||||
334<\/td>\n | 5B1.20 Roof Construction <\/td>\n<\/tr>\n | ||||||
335<\/td>\n | 5B2 Exterior Enclosure 5B2.10 Exterior Walls <\/td>\n<\/tr>\n | ||||||
338<\/td>\n | 5B2.20 Exterior Windows <\/td>\n<\/tr>\n | ||||||
339<\/td>\n | 5B2.30 Exterior Doors <\/td>\n<\/tr>\n | ||||||
340<\/td>\n | 5B3 Roofing 5B3.10 Roof Coverings <\/td>\n<\/tr>\n | ||||||
342<\/td>\n | 5B3.20 Roof Openings <\/td>\n<\/tr>\n | ||||||
343<\/td>\n | 5C INTERIORS 5C.0 Introduction <\/td>\n<\/tr>\n | ||||||
344<\/td>\n | 5C1 Interior Construction 5C1.10 Partitions <\/td>\n<\/tr>\n | ||||||
346<\/td>\n | 5C1.20 Interior Doors <\/td>\n<\/tr>\n | ||||||
351<\/td>\n | 5C1.30 Fittings <\/td>\n<\/tr>\n | ||||||
354<\/td>\n | 5C2 Stairs 5C2.10 Interior Stairs Construction <\/td>\n<\/tr>\n | ||||||
355<\/td>\n | 5C2.20 Interior Stair Finishes <\/td>\n<\/tr>\n | ||||||
356<\/td>\n | 5C3 Interior Finishes 5C3.10 Wall Finishes <\/td>\n<\/tr>\n | ||||||
358<\/td>\n | 5C3.20 Floor Finishes <\/td>\n<\/tr>\n | ||||||
362<\/td>\n | 5C3.30 Ceiling Finishes <\/td>\n<\/tr>\n | ||||||
363<\/td>\n | 5D SERVICES 5D0 Introduction <\/td>\n<\/tr>\n | ||||||
364<\/td>\n | 5D1 Conveying Systems 5D1.10 Elevators and Lifts <\/td>\n<\/tr>\n | ||||||
365<\/td>\n | 5D1.20 Escalators and Moving Walks <\/td>\n<\/tr>\n | ||||||
366<\/td>\n | 5D2 Plumbing Systems <\/td>\n<\/tr>\n | ||||||
367<\/td>\n | 5D2.10 Plumbing Fixtures <\/td>\n<\/tr>\n | ||||||
368<\/td>\n | 5D2.20 Domestic Water Distribution <\/td>\n<\/tr>\n | ||||||
370<\/td>\n | 5D2.30 Sanitary Waste and Vent Systems <\/td>\n<\/tr>\n | ||||||
371<\/td>\n | 5D2.40 Rain Water Drainage <\/td>\n<\/tr>\n | ||||||
372<\/td>\n | 5D2.50 Gas Distributing Systems <\/td>\n<\/tr>\n | ||||||
373<\/td>\n | 5D3 HVAC 5D3.10 Boiler Room Piping and Specialties <\/td>\n<\/tr>\n | ||||||
374<\/td>\n | 5D3.20 Piping Distribution Systems <\/td>\n<\/tr>\n | ||||||
376<\/td>\n | 5D3.21 Air Distribution Systems <\/td>\n<\/tr>\n | ||||||
381<\/td>\n | 5D3.22 Exhaust Ventilation Systems <\/td>\n<\/tr>\n | ||||||
382<\/td>\n | 5D3.23 Steam Distribution Systems <\/td>\n<\/tr>\n | ||||||
384<\/td>\n | 5D3.25 Glycol Distribution Systems <\/td>\n<\/tr>\n | ||||||
385<\/td>\n | 5D3.30 Building Automation Systems <\/td>\n<\/tr>\n | ||||||
391<\/td>\n | 5D3.40 Systems Testing and Balancing <\/td>\n<\/tr>\n | ||||||
395<\/td>\n | 5D4.10 Sprinklers <\/td>\n<\/tr>\n | ||||||
398<\/td>\n | 5D4.20 Standpipe Systems <\/td>\n<\/tr>\n | ||||||
399<\/td>\n | 5D4.30 Fire Pumps <\/td>\n<\/tr>\n | ||||||
400<\/td>\n | 5D4.40 Fire Protection Specialties <\/td>\n<\/tr>\n | ||||||
401<\/td>\n | 5D4.50 Other Fire Protection Systems <\/td>\n<\/tr>\n | ||||||
402<\/td>\n | 5D5 Electrical 5D5.10 Electrical Service & Distribution <\/td>\n<\/tr>\n | ||||||
430<\/td>\n | 5D5.11 Electrical Studies <\/td>\n<\/tr>\n | ||||||
440<\/td>\n | 5D5.20 Lighting & Branch Wiring <\/td>\n<\/tr>\n | ||||||
452<\/td>\n | 5D5.30 Communications, Security & Fire Alarm Systems <\/td>\n<\/tr>\n | ||||||
464<\/td>\n | 5D5.40 Lightning Protection\/ Grounding <\/td>\n<\/tr>\n | ||||||
468<\/td>\n | 5D5.41 Emergency, Legally Required Standby, and Standby Power Systems <\/td>\n<\/tr>\n | ||||||
478<\/td>\n | 5D5.42 Special Equipment <\/td>\n<\/tr>\n | ||||||
482<\/td>\n | 5D5.43 Communication And Signaling Systems <\/td>\n<\/tr>\n | ||||||
483<\/td>\n | 5D5.44 Freezer Alarm System <\/td>\n<\/tr>\n | ||||||
484<\/td>\n | 5E EQUIPMENT & FURNISHINGS 5E0 Introduction <\/td>\n<\/tr>\n | ||||||
486<\/td>\n | 5E1 Equipment 5E1.10 Office And Office Support Equipment <\/td>\n<\/tr>\n | ||||||
490<\/td>\n | 5E1.20 Laboratory And Laboratory Support Equipment <\/td>\n<\/tr>\n | ||||||
493<\/td>\n | 5E1.30 Vehicular Equipment <\/td>\n<\/tr>\n | ||||||
494<\/td>\n | 5E2 Furnishings 5E2.10 Fixed Furnishings <\/td>\n<\/tr>\n | ||||||
496<\/td>\n | 5E2.20 Movable Furnishings <\/td>\n<\/tr>\n | ||||||
508<\/td>\n | 5F SPECIAL CONSTRUCTION & DEMOLITION 5F0 Introduction <\/td>\n<\/tr>\n | ||||||
509<\/td>\n | 5F1 Special Construction Systems 5F1.10 Special Structures <\/td>\n<\/tr>\n | ||||||
510<\/td>\n | 5F1.20 Integrated Construction <\/td>\n<\/tr>\n | ||||||
512<\/td>\n | 5F1.50 Special Controls & Instrumentation <\/td>\n<\/tr>\n | ||||||
513<\/td>\n | 5F2 Selective Building Demolition 5F2.10 Building Elements Demolition <\/td>\n<\/tr>\n | ||||||
514<\/td>\n | 5F2.20 Hazardous Components Abatement <\/td>\n<\/tr>\n | ||||||
515<\/td>\n | 5G BUILDING SITEWORK 5G0 General <\/td>\n<\/tr>\n | ||||||
517<\/td>\n | 5G1 Site Preparation <\/td>\n<\/tr>\n | ||||||
518<\/td>\n | 5G1.10 Site Preparation <\/td>\n<\/tr>\n | ||||||
520<\/td>\n | 5G1.20 Site Demolition & Relocation <\/td>\n<\/tr>\n | ||||||
522<\/td>\n | 5G1.30 Site Earthwork <\/td>\n<\/tr>\n | ||||||
524<\/td>\n | 5G1.40 Hazardous Waste Remediation <\/td>\n<\/tr>\n | ||||||
525<\/td>\n | 5G2 Site Improvements 5G2.10 Roadways <\/td>\n<\/tr>\n | ||||||
527<\/td>\n | 5G2.20 Parking Lots <\/td>\n<\/tr>\n | ||||||
529<\/td>\n | 5G2.30 Pedestrian Circulation <\/td>\n<\/tr>\n | ||||||
531<\/td>\n | 5G2.40 Site Development <\/td>\n<\/tr>\n | ||||||
534<\/td>\n | 5G2.50 Landscaping <\/td>\n<\/tr>\n | ||||||
537<\/td>\n | 5G2.60 Irrigation <\/td>\n<\/tr>\n | ||||||
539<\/td>\n | 5G3 Site Mechanical Utilities 5G3.10 Water Supply <\/td>\n<\/tr>\n | ||||||
541<\/td>\n | 5G3.20 Sanitary Sewer <\/td>\n<\/tr>\n | ||||||
542<\/td>\n | 5G3.30 Storm Sewer <\/td>\n<\/tr>\n | ||||||
544<\/td>\n | 5G3.40 Heating Distribution <\/td>\n<\/tr>\n | ||||||
545<\/td>\n | 5G3.50 Cooling Distribution <\/td>\n<\/tr>\n | ||||||
546<\/td>\n | 5G3.60 Fuel Distribution <\/td>\n<\/tr>\n | ||||||
548<\/td>\n | 5G4 Site Electrical Utilities 5G4.10 Electrical Distribution <\/td>\n<\/tr>\n | ||||||
550<\/td>\n | 5G4.20 Site Lighting <\/td>\n<\/tr>\n | ||||||
552<\/td>\n | 5G4.30 Site Communications & Security <\/td>\n<\/tr>\n | ||||||
553<\/td>\n | 5G4.90 Other Site Electrical Utilities <\/td>\n<\/tr>\n | ||||||
554<\/td>\n | 5G5 Other Site Construction 5G5.10 Service And Pedestrian Tunnels <\/td>\n<\/tr>\n | ||||||
555<\/td>\n | 5G5.20 Pest Management Program During Construction <\/td>\n<\/tr>\n | ||||||
556<\/td>\n | 6 APPENDIX 6.01 Request for Exception Form <\/td>\n<\/tr>\n | ||||||
557<\/td>\n | 6.02 Request for Clarification Form <\/td>\n<\/tr>\n | ||||||
558<\/td>\n | 6.10 Interiors <\/td>\n<\/tr>\n | ||||||
588<\/td>\n | 6.30 Document components, writing\/editing rules and UniFormat <\/td>\n<\/tr>\n | ||||||
589<\/td>\n | 6.40 Survey Control Monuments\u2019 Locations and Descriptions <\/td>\n<\/tr>\n | ||||||
590<\/td>\n | 6.50 Acronyms <\/td>\n<\/tr>\n | ||||||
594<\/td>\n | 6.60 Glossary <\/td>\n<\/tr>\n | ||||||
595<\/td>\n | 6.70 Accessibility <\/td>\n<\/tr>\n | ||||||
598<\/td>\n | 6.80 Facilities Master Planning Guide <\/td>\n<\/tr>\n | ||||||
599<\/td>\n | 6.90 Wayfinding Masterplan <\/td>\n<\/tr>\n | ||||||
608<\/td>\n | 6.20 HHS Office Design Guidelines <\/td>\n<\/tr>\n | ||||||
653<\/td>\n | 6.91 BAS Graphics Standards <\/td>\n<\/tr>\n | ||||||
682<\/td>\n | 6.92 Lactation Support Program <\/td>\n<\/tr>\n | ||||||
689<\/td>\n | 6.93 Electrical <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" CDC Reference Guidelines – Design & Construction Standards, Revised on June 15, 2018<\/b><\/p>\n |