{"id":358992,"date":"2024-10-20T01:23:57","date_gmt":"2024-10-20T01:23:57","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-20302012-edition-1\/"},"modified":"2024-10-26T02:02:40","modified_gmt":"2024-10-26T02:02:40","slug":"bsi-pas-20302012-edition-1","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-20302012-edition-1\/","title":{"rendered":"BSI PAS 2030:2012 Edition 1"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4 Installation process 4.1 Method statement 4.2 Energy efficiency measure design specification 4.3 Installation location information <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.4 Installation methods 4.5 Installation equipment and tools 4.6 Checking, handling and storage 4.7 Provision of installation instructions to operatives <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.8 Intermediate inspections 4.9 People 4.10 Engagement of subcontract installers <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.11 Commissioning 4.12 Handover 4.13 Installation control 4.14 Installation documents and record keeping <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5 Installation process management 5.1 Operation and process oversight 5.2 Pre-installation survey 5.3 Action in respect of intermediate inspection 5.4 Installation process change <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.5 Process continuity plan 5.6 Process control 5.7 Internal audit and corrective action 5.8 Installation process records 5.9 Business and financial probity <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6 Service provision 6.1 Complaints procedure 6.2 Interaction with customers 7 Claims of conformity 7.1 General claims requirement 7.2 Declarations of conformity <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8 Documents essential to the application of the Annexes of this PAS 8.1 Use of the identified documents 8.2 British Standards <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 8.3 Institution of Gas Engineer and Managers \u2013 Standards 8.5 UKLPG 8.6 Department of Communities and Local Government <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.7 Common Minimum Technical Competence Annexes <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Annex A (normative) Condensing boilers, natural gas-fired and liquefied petroleum gas-fired (domestic and non-domestic) <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex B (normative) Condensing boilers, oil-fired (domestic and non-domestic) <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Annex C (normative) Heating controls <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Annex D (normative) Under-floor heating <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Annex E (normative) Flue-gas recovery devices <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex F (normative) Gas-fired warm-air heating systems (domestic and non-domestic) <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Annex G (normative) Electric storage heaters (domestic and non-domestic) <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Annex H (normative) Cavity wall insulation <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Annex I (normative) Loft insulation <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Annex J (normative) Pitched roof insulation <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Annex K (normative) Flat roof insulation <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | Annex L (normative) Internal wall insulation <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Annex M (normative) External wall insulation <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | Annex N (normative) Hybrid wall insulation <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | Annex O (normative) Draught proofing <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Annex P (normative) Floor insulation <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | Annex Q (normative) Heating system insulation (pipes and cylinders) <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | Annex R (normative) Energy efficient glazing and doors <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | Annex S (normative) Lighting fittings <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | Annex T (normative) Lighting controls (Non-domestic) <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | Annex U (normative) Ground and air source heat pumps <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | Annex V (normative) Solar thermal <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | Annex W (normative) Solar PV <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | Annex X (normative) Biomass boilers <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | Annex Y (normative) Micro-combined heat and power (CHP) <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | Annex Z (normative) Micro- and small-scale wind turbine systems <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | Annex AA (informative)Installation project information collation form <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Improving the energy efficiency of existing buildings. Specification for installation process, process management and service provision<\/b><\/p>\n |