{"id":126031,"date":"2024-10-19T05:31:07","date_gmt":"2024-10-19T05:31:07","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1717-2024-2\/"},"modified":"2024-10-24T23:17:29","modified_gmt":"2024-10-24T23:17:29","slug":"ieee-1717-2024-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1717-2024-2\/","title":{"rendered":"IEEE 1717-2024"},"content":{"rendered":"
Revision Standard – Active. Standardization of circuit integrity cable testing is beneficial to cable manufacturers, distributors, and users. Uniform procedures, consistent, repeatable results, and measurable test acceptance criteria are required to allow comparisons among competing products and to allow selection of the correct product for the application.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1717\u2122-2024 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1.4\u2002Applications 1.5\u2002Disclaimer 1.6\u2002Test precautions 2.\u2002Normative references 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3.2\u2002Acronyms and abbreviations 4.\u2002Test equipment 4.1\u2002Apparatus <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.2\u2002Cable tray <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.3\u2002Burners and hydrocarbon test conditions 4.4\u2002Burner gas <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.5\u2002Supply air 4.6\u2002Fuel flow 4.7\u2002Air flow 4.8\u2002Power supply\u2014Application of allowable voltage and light bulbs load set up <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.9\u2002Temperature measurement and monitoring equipment 4.10\u2002Furnace calibration <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.\u2002Test sample requirements 5.1\u2002Cable samples and test voltage <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.2\u2002Sample constructions for testing in tray or in conduit <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.3\u2002Test in-conduit 5.4\u2002Splices and cable glands 5.5\u2002Conclusions and decision-making based on test results <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.\u2002Circuit integrity test procedure 6.1\u2002General 6.2\u2002Cable mounting 6.3\u2002Test procedure <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.4\u2002Vibration test 7.\u2002Test evaluation 7.1\u2002Conditions of acceptance 7.2\u2002Test report <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.\u2002Cable marking 9.\u2002Installation <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Annex\u00a0A (normative) Fast rise fire temperature curve <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex\u00a0B (informative) Vibration test procedures\u2014Optional <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex\u00a0C (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard for Testing Fire-Resistive, Circuit Integrity Cables and Cable Systems Using a Hydrocarbon Pool Fire Test Protocol (Approved Draft)<\/b><\/p>\n |