{"id":211669,"date":"2024-10-19T13:41:43","date_gmt":"2024-10-19T13:41:43","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1267-2019\/"},"modified":"2024-10-25T06:30:18","modified_gmt":"2024-10-25T06:30:18","slug":"ieee-1267-2019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1267-2019\/","title":{"rendered":"IEEE 1267 2019"},"content":{"rendered":"
Revision Standard – Active. Systematic methodology, guidelines and practices for developing turnkey substation specifications are provided in this guide. Guidance on engineering, procurement, construction, testing and commissioning, quality assurance\/quality control and training is provided.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1267\u2122-2019 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 2.\u2002Definitions, abbreviations, and acronyms 2.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2.2\u2002Abbreviations and acronyms 3.\u2002General 3.1\u2002Overall discussion and requirements of a substation turnkey specification <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 3.2\u2002Contractor qualification and certification 3.3\u2002Importance of detailed scope <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3.4\u2002Suggested format of turnkey specification package <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.\u2002Engineering 4.1\u2002General description 4.2\u2002Design standards 4.3\u2002Design requirements <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 4.4\u2002Documentation 5.\u2002Procurement 5.1\u2002Materials furnished by Others 5.2\u2002Equipment specifications 5.3\u2002Other considerations <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.\u2002Construction 6.1\u2002Specific construction specifications <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.2\u2002Scheduling 7.\u2002Testing and commissioning 7.1\u2002General 7.2\u2002Scope <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 7.3\u2002Requirements 7.4\u2002Documentation 8.\u2002Quality assurance\/quality control <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9.\u2002Training <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex\u00a0A (informative) Recommended equipment requirements A.1\u2002Land use and environmental considerations <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | A.2\u2002Aesthetic and environmental impact considerations <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | A.3\u2002Permits and ordinances <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | A.4\u2002Equipment <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex\u00a0B (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Development of Specifications for Turnkey Substation Projects<\/b><\/p>\n |