Shopping Cart

No products in the cart.

ACI 376M 11:2013 Edition

$73.94

376M-11 Metric Code Reqs for Design & Constr of Conc Structures for Containment of Refrigerated Liquefied Gases

Published By Publication Date Number of Pages
ACI 2013 156
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This code provides minimum requirements for design and construction of reinforced concrete and prestressed concrete structures for the storage and containment of refrigerated liquefied gases (RLG) with service temperatures between +40 and –325°F. The principles listed herein are applicable to concrete foundations of double-steel tanks subject to the approval of the owner. Container design shall include the design of the container wall, its foundation (footing and floor slab), the concrete portions of its roof, and the bund wall, whenever applicable. Available in hard copy or electronic format. Keywords: bund wall; commissioning; cryogenic; damage stability; decommissioning; earthquake design levels; fatigue; float out; floating storage unit; foundation heating; gravity base structure; impact loads; liners; liquefied natural gas; liquid stratification; permanent ballast; purging; refrigerated liquefied gas; reinforcement (cryogenic); tanks; thermal corner protection

PDF Catalog

PDF Pages PDF Title
3 TITLE PAGE
TITLE PAGE
5 INTRODUCTION
INTRODUCTION
7 CHAPTER 1—GENERAL
CHAPTER 1—GENERAL
1.1—Scope
1.1—Scope
8 1.2—Quality assurance
1.2—Quality assurance
9 CHAPTER 2—NOTATION AND DEFINITIONS
CHAPTER 2—NOTATION AND DEFINITIONS
2.1—Notation
2.1—Notation
10 2.2—Definitions
2.2—Definitions
16 CHAPTER 3—REFERENCED STANDARDS
CHAPTER 3—REFERENCED STANDARDS
20 CHAPTER 4—MATERIALS
CHAPTER 4—MATERIALS
4.1—Testing of materials
4.1—Testing of materials
4.2—Cementitious materials
4.2—Cementitious materials
4.3—Aggregates
4.3—Aggregates
21 4.4—Water
4.4—Water
4.5—Admixtures
4.5—Admixtures
4.6—Fibers
4.6—Fibers
4.7—Deformed reinforcement
4.7—Deformed reinforcement
22 4.8—Plate steel composite with concrete
4.8—Plate steel composite with concrete
23 4.9—Prestressed reinforcement
4.9—Prestressed reinforcement
4.10—Prestressing anchorages
4.10—Prestressing anchorages
24 4.11—Post-tensioning ducts
4.11—Post-tensioning ducts
4.12—Grout
4.12—Grout
4.13—Metal liners and nonstructural metal components
4.13—Metal liners and nonstructural metal components
25 4.14—Insulation
4.14—Insulation
4.15—Coating requirements
4.15—Coating requirements
26 CHAPTER 5—DESIGN LOADS
CHAPTER 5—DESIGN LOADS
5.1—Design loads
5.1—Design loads
30 5.2—Loading conditions
5.2—Loading conditions
33 CHAPTER 6—MINIMUM PERFORMANCE REQUIREMENTS
CHAPTER 6—MINIMUM PERFORMANCE REQUIREMENTS
6.1—General
6.1—General
6.2—Primary concrete container
6.2—Primary concrete container
36 6.3—Secondary concrete container
6.3—Secondary concrete container
37 6.4—Roof performance criteria
6.4—Roof performance criteria
6.5—Other performance criteria
6.5—Other performance criteria
38 6.6—Concrete quality
6.6—Concrete quality
42 6.7—Shotcrete
6.7—Shotcrete
6.8—Coating design
6.8—Coating design
43 6.9—Metal components
6.9—Metal components
44 CHAPTER 7—LOAD FACTORS
CHAPTER 7—LOAD FACTORS
7.1—General
7.1—General
7.2—Load factors for ultimate limit state of primary container
7.2—Load factors for ultimate limit state of primary container
47 7.3—Load factors for ultimate limit state of secondary container
7.3—Load factors for ultimate limit state of secondary container
51 CHAPTER 8—ANALYSIS AND DESIGN
CHAPTER 8—ANALYSIS AND DESIGN
8.1—Methods of analysis
8.1—Methods of analysis
56 8.2—Design basis
8.2—Design basis
8.3—Foundation design
8.3—Foundation design
57 8.4—Wall design
8.4—Wall design
60 8.5—Roof design
8.5—Roof design
62 CHAPTER 9—DETAILING
CHAPTER 9—DETAILING
9.1—General
9.1—General
9.2—Reinforcement details
9.2—Reinforcement details
63 9.3—Internal prestressing systems
9.3—Internal prestressing systems
65 9.4—External prestressing systems
9.4—External prestressing systems
9.5—Concrete containment wall
9.5—Concrete containment wall
67 9.6—Metal components
9.6—Metal components
68 9.7—Anchorage to concrete
9.7—Anchorage to concrete
69 9.8—Liners and coatings
9.8—Liners and coatings
71 CHAPTER 10—FOUNDATIONS
CHAPTER 10—FOUNDATIONS
10.1—General
10.1—General
10.2—Geotechnical investigation
10.2—Geotechnical investigation
74 10.3—Design requirements for shallow foundations
10.3—Design requirements for shallow foundations
78 10.4—Design requirements for deep foundations
10.4—Design requirements for deep foundations
82 10.5—Ground improvement
10.5—Ground improvement
10.6—Foundation details
10.6—Foundation details
84 10.7—Foundation performance monitoring details
10.7—Foundation performance monitoring details
86 10.8—Monitoring frequency
10.8—Monitoring frequency
87 10.9—Inspection and testing
10.9—Inspection and testing
89 CHAPTER 11—CONSTRUCTION REQUIREMENTS
CHAPTER 11—CONSTRUCTION REQUIREMENTS
11.1—Construction plan
11.1—Construction plan
11.2—Tolerances
11.2—Tolerances
92 11.3—Shotcrete for external prestressing systems
11.3—Shotcrete for external prestressing systems
93 11.4—Post-tensioning
11.4—Post-tensioning
97 11.5—Winding of prestressed reinforcement: wire or strand
11.5—Winding of prestressed reinforcement: wire or strand
11.6—Forming
11.6—Forming
99 11.7—Construction joints
11.7—Construction joints
11.8—Concrete embedments
11.8—Concrete embedments
100 11.9—Coatings
11.9—Coatings
11.10—Welding
11.10—Welding
101 CHAPTER 12—COMMISSIONING/DECOMMISSIONING
CHAPTER 12—COMMISSIONING/DECOMMISSIONING
12.1—Scope
12.1—Scope
12.2—Testing
12.2—Testing
106 12.3—Pressure and vacuum testing
12.3—Pressure and vacuum testing
107 12.4—Purging into service
12.4—Purging into service
108 12.5—Cool-down
12.5—Cool-down
110 12.6—Settlement and movement monitoring
12.6—Settlement and movement monitoring
111 12.7—Liquefied natural gas tank fill methods
12.7—Liquefied natural gas tank fill methods
12.8—Decommissioning: purging out of service and warm-up
12.8—Decommissioning: purging out of service and warm-up
113 12.9—Recordkeeping
12.9—Recordkeeping
12.10—Nameplate
12.10—Nameplate
115 APPENDIX A—TANK CONFIGURATIONS, DETAILS, AND EXAMPLES
APPENDIX A—TANK CONFIGURATIONS, DETAILS, AND EXAMPLES
RA.1—Tank configurations
RA.1—Tank configurations
RA.2—Full-containment tanks: typical details
RA.2—Full-containment tanks: typical details
RA.3—Examples of base joint details
RA.3—Examples of base joint details
126 APPENDIX B—OFFSHORE CONCRETE TERMINALS
APPENDIX B—OFFSHORE CONCRETE TERMINALS
B.1—Scope
B.1—Scope
B.2—General
B.2—General
127 B.3—Loads and load combinations
B.3—Loads and load combinations
130 B.4—Concrete and reinforcement materials
B.4—Concrete and reinforcement materials
131 B.5—Global and local structural analysis
B.5—Global and local structural analysis
133 B.6—Criteria and methodology of concrete sectional design
B.6—Criteria and methodology of concrete sectional design
134 B.7—Fatigue performance criteria
B.7—Fatigue performance criteria
B.8—Design considerations during construction, transportation, and installation
B.8—Design considerations during construction, transportation, and installation
137 B.9—Decommissioning
B.9—Decommissioning
B.10—Design for accidents
B.10—Design for accidents
141 APPENDIX C—FATIGUE PERFORMANCE
APPENDIX C—FATIGUE PERFORMANCE
C.1—Scope
C.1—Scope
C.2—General
C.2—General
C.3—Fatigue performance criteria
C.3—Fatigue performance criteria
144 COMMENTARY REFERENCES
COMMENTARY REFERENCES
ACI 376M 11
$73.94