ACI 376M 11:2013 Edition
$73.94
376M-11 Metric Code Reqs for Design & Constr of Conc Structures for Containment of Refrigerated Liquefied Gases
Published By | Publication Date | Number of Pages |
ACI | 2013 | 156 |
This code provides minimum requirements for design and construction of reinforced concrete and prestressed concrete structures for the storage and containment of refrigerated liquefied gases (RLG) with service temperatures between +40 and –325°F. The principles listed herein are applicable to concrete foundations of double-steel tanks subject to the approval of the owner. Container design shall include the design of the container wall, its foundation (footing and floor slab), the concrete portions of its roof, and the bund wall, whenever applicable. Available in hard copy or electronic format. Keywords: bund wall; commissioning; cryogenic; damage stability; decommissioning; earthquake design levels; fatigue; float out; floating storage unit; foundation heating; gravity base structure; impact loads; liners; liquefied natural gas; liquid stratification; permanent ballast; purging; refrigerated liquefied gas; reinforcement (cryogenic); tanks; thermal corner protection
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | TITLE PAGE TITLE PAGE |
5 | INTRODUCTION INTRODUCTION |
7 | CHAPTER 1—GENERAL CHAPTER 1—GENERAL 1.1—Scope 1.1—Scope |
8 | 1.2—Quality assurance 1.2—Quality assurance |
9 | CHAPTER 2—NOTATION AND DEFINITIONS CHAPTER 2—NOTATION AND DEFINITIONS 2.1—Notation 2.1—Notation |
10 | 2.2—Definitions 2.2—Definitions |
16 | CHAPTER 3—REFERENCED STANDARDS CHAPTER 3—REFERENCED STANDARDS |
20 | CHAPTER 4—MATERIALS CHAPTER 4—MATERIALS 4.1—Testing of materials 4.1—Testing of materials 4.2—Cementitious materials 4.2—Cementitious materials 4.3—Aggregates 4.3—Aggregates |
21 | 4.4—Water 4.4—Water 4.5—Admixtures 4.5—Admixtures 4.6—Fibers 4.6—Fibers 4.7—Deformed reinforcement 4.7—Deformed reinforcement |
22 | 4.8—Plate steel composite with concrete 4.8—Plate steel composite with concrete |
23 | 4.9—Prestressed reinforcement 4.9—Prestressed reinforcement 4.10—Prestressing anchorages 4.10—Prestressing anchorages |
24 | 4.11—Post-tensioning ducts 4.11—Post-tensioning ducts 4.12—Grout 4.12—Grout 4.13—Metal liners and nonstructural metal components 4.13—Metal liners and nonstructural metal components |
25 | 4.14—Insulation 4.14—Insulation 4.15—Coating requirements 4.15—Coating requirements |
26 | CHAPTER 5—DESIGN LOADS CHAPTER 5—DESIGN LOADS 5.1—Design loads 5.1—Design loads |
30 | 5.2—Loading conditions 5.2—Loading conditions |
33 | CHAPTER 6—MINIMUM PERFORMANCE REQUIREMENTS CHAPTER 6—MINIMUM PERFORMANCE REQUIREMENTS 6.1—General 6.1—General 6.2—Primary concrete container 6.2—Primary concrete container |
36 | 6.3—Secondary concrete container 6.3—Secondary concrete container |
37 | 6.4—Roof performance criteria 6.4—Roof performance criteria 6.5—Other performance criteria 6.5—Other performance criteria |
38 | 6.6—Concrete quality 6.6—Concrete quality |
42 | 6.7—Shotcrete 6.7—Shotcrete 6.8—Coating design 6.8—Coating design |
43 | 6.9—Metal components 6.9—Metal components |
44 | CHAPTER 7—LOAD FACTORS CHAPTER 7—LOAD FACTORS 7.1—General 7.1—General 7.2—Load factors for ultimate limit state of primary container 7.2—Load factors for ultimate limit state of primary container |
47 | 7.3—Load factors for ultimate limit state of secondary container 7.3—Load factors for ultimate limit state of secondary container |
51 | CHAPTER 8—ANALYSIS AND DESIGN CHAPTER 8—ANALYSIS AND DESIGN 8.1—Methods of analysis 8.1—Methods of analysis |
56 | 8.2—Design basis 8.2—Design basis 8.3—Foundation design 8.3—Foundation design |
57 | 8.4—Wall design 8.4—Wall design |
60 | 8.5—Roof design 8.5—Roof design |
62 | CHAPTER 9—DETAILING CHAPTER 9—DETAILING 9.1—General 9.1—General 9.2—Reinforcement details 9.2—Reinforcement details |
63 | 9.3—Internal prestressing systems 9.3—Internal prestressing systems |
65 | 9.4—External prestressing systems 9.4—External prestressing systems 9.5—Concrete containment wall 9.5—Concrete containment wall |
67 | 9.6—Metal components 9.6—Metal components |
68 | 9.7—Anchorage to concrete 9.7—Anchorage to concrete |
69 | 9.8—Liners and coatings 9.8—Liners and coatings |
71 | CHAPTER 10—FOUNDATIONS CHAPTER 10—FOUNDATIONS 10.1—General 10.1—General 10.2—Geotechnical investigation 10.2—Geotechnical investigation |
74 | 10.3—Design requirements for shallow foundations 10.3—Design requirements for shallow foundations |
78 | 10.4—Design requirements for deep foundations 10.4—Design requirements for deep foundations |
82 | 10.5—Ground improvement 10.5—Ground improvement 10.6—Foundation details 10.6—Foundation details |
84 | 10.7—Foundation performance monitoring details 10.7—Foundation performance monitoring details |
86 | 10.8—Monitoring frequency 10.8—Monitoring frequency |
87 | 10.9—Inspection and testing 10.9—Inspection and testing |
89 | CHAPTER 11—CONSTRUCTION REQUIREMENTS CHAPTER 11—CONSTRUCTION REQUIREMENTS 11.1—Construction plan 11.1—Construction plan 11.2—Tolerances 11.2—Tolerances |
92 | 11.3—Shotcrete for external prestressing systems 11.3—Shotcrete for external prestressing systems |
93 | 11.4—Post-tensioning 11.4—Post-tensioning |
97 | 11.5—Winding of prestressed reinforcement: wire or strand 11.5—Winding of prestressed reinforcement: wire or strand 11.6—Forming 11.6—Forming |
99 | 11.7—Construction joints 11.7—Construction joints 11.8—Concrete embedments 11.8—Concrete embedments |
100 | 11.9—Coatings 11.9—Coatings 11.10—Welding 11.10—Welding |
101 | CHAPTER 12—COMMISSIONING/DECOMMISSIONING CHAPTER 12—COMMISSIONING/DECOMMISSIONING 12.1—Scope 12.1—Scope 12.2—Testing 12.2—Testing |
106 | 12.3—Pressure and vacuum testing 12.3—Pressure and vacuum testing |
107 | 12.4—Purging into service 12.4—Purging into service |
108 | 12.5—Cool-down 12.5—Cool-down |
110 | 12.6—Settlement and movement monitoring 12.6—Settlement and movement monitoring |
111 | 12.7—Liquefied natural gas tank fill methods 12.7—Liquefied natural gas tank fill methods 12.8—Decommissioning: purging out of service and warm-up 12.8—Decommissioning: purging out of service and warm-up |
113 | 12.9—Recordkeeping 12.9—Recordkeeping 12.10—Nameplate 12.10—Nameplate |
115 | APPENDIX A—TANK CONFIGURATIONS, DETAILS, AND EXAMPLES APPENDIX A—TANK CONFIGURATIONS, DETAILS, AND EXAMPLES RA.1—Tank configurations RA.1—Tank configurations RA.2—Full-containment tanks: typical details RA.2—Full-containment tanks: typical details RA.3—Examples of base joint details RA.3—Examples of base joint details |
126 | APPENDIX B—OFFSHORE CONCRETE TERMINALS APPENDIX B—OFFSHORE CONCRETE TERMINALS B.1—Scope B.1—Scope B.2—General B.2—General |
127 | B.3—Loads and load combinations B.3—Loads and load combinations |
130 | B.4—Concrete and reinforcement materials B.4—Concrete and reinforcement materials |
131 | B.5—Global and local structural analysis B.5—Global and local structural analysis |
133 | B.6—Criteria and methodology of concrete sectional design B.6—Criteria and methodology of concrete sectional design |
134 | B.7—Fatigue performance criteria B.7—Fatigue performance criteria B.8—Design considerations during construction, transportation, and installation B.8—Design considerations during construction, transportation, and installation |
137 | B.9—Decommissioning B.9—Decommissioning B.10—Design for accidents B.10—Design for accidents |
141 | APPENDIX C—FATIGUE PERFORMANCE APPENDIX C—FATIGUE PERFORMANCE C.1—Scope C.1—Scope C.2—General C.2—General C.3—Fatigue performance criteria C.3—Fatigue performance criteria |
144 | COMMENTARY REFERENCES COMMENTARY REFERENCES |