NC UNC ElectricalGuideline 2013
$6.50
UNC Chapel Hill – Department of Facilities Services – Electrical Guidelines
Published By | Publication Date | Number of Pages |
NC | 2013 | 21 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ELECTRICAL TABLE OF CONTENTS |
3 | I. ELECTRICAL A. GENERAL 1. Description 2. Applicable Codes, Regulations, and Standards 3. Equipment Identification All equipment shall be properly identified with equipment identification, equipment controlled, panel and circuit feeding equipment, electrical ratings and date of installation. 4. Electrical Systems Training |
4 | 5. Acceptance Criteria After completion of specified training, the Contractor shall conduct the specified operation acceptance test, witnessed by the Owner’s representative. Contractor shall submit copies of reports documenting all specified tests to owner. B. WIRE AND CABLE C. CONDUITS D. OUTLET BOXES |
5 | E. WIRING DEVICES F. GENERATOR SYSTEMS AND TRANSFER SWITCHES 1. General |
6 | 2. Manufacturer’s Qualifications 3. Submittals |
7 | 4. Packaged Engine Generator Requirements 5. Noise 6. Fuel oil tanks: 7. Exhaust |
8 | 8. Outdoor Enclosure 9. Interior Locations 10. Engine-generator controls 11. Remote annunciation 12. Installation G. AUTOMATIC TRANSFER SWITCHES |
9 | 1. Components 2. Remote http connectivity with ASCO transfer switch (Preferred Alternate) |
10 | H. GENERATOR / TRANSFER SWITCH SYSTEM TESTING & CERTIFICATION 1. Database and Engine Inspection: a) The complete final configuration database (site-specific programming) for the system must be permanently stored on a computer disk or CD and archived by the manufacturer or authorized distributor. A disk or CD copy of that database must also be pr… b) The Manufacturer or authorized distributor must maintain software version (VER) records on the system installed. The system software shall be upgraded free of charge if a new VER is released for any reason during the warranty period. For any new … 2. Contractor/Installer Field Testing: a) The owner shall be given advance notification in order to witness testing. b) Testing shall be performed using all installed generator loads supplemented with additional load to generator’s nameplate rating. Where more than one building is on a generator, all buildings’ loads will be utilized. The maintenance instruction sha… c) The documentation shall be part of the programming reports. The contractor shall keep history of all deficiencies determined. All deficiencies shall be corrected and retested. Once this has been accomplished, the contractor shall submit to the A… I. VARIABLE FREQUENCY DRIVES 1. Quality Assurance |
11 | 2. Products 3. Construction |
12 | 4. Application Data |
13 | 5. Operator Control Interface |
14 | 6. Drive / Bypass Contractors 7. Execution |
15 | 8. Training 9. Documentation J. ALARM AND DETECTION SYSTEM CENTRAL ALARM RECEIVING SYSTEM K. SERVICE AND DISTRIBUTION |
16 | L. PANELS |
17 | M. TRANSFORMERS, DRY TYPE 1. General 2. Construction |
18 | N. INTERIOR LIGHTING LUMINAIRES 1. Lighting Level Guidelines |
19 | 2. Interior Lighting Control 3. Lighting Fixture Applications |
20 | 4. Lighting of Large Interior Areas 5. Lighting Maintenance Considerations 6. Exit and Egress Lights O. CLASSROOMS FOR MULTIMEDIA PRESENTATIONS |
21 | P. CLASSROOMS FOR MULTIMEDIA PRESENTATIONS Q. EXTERIOR WALL MOUNTED BUILDING LIGHTING R. TELECOMMUNICATIONS |