{"id":213627,"date":"2024-10-19T13:50:33","date_gmt":"2024-10-19T13:50:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-594-21992\/"},"modified":"2024-10-25T06:45:33","modified_gmt":"2024-10-25T06:45:33","slug":"bs-594-21992","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-594-21992\/","title":{"rendered":"BS 594-2:1992"},"content":{"rendered":"
Requirements for preparation of substrate and finishing or wearing course.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | BRITISH STANDARD <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Committees responsible for this British\ufffdStandard <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1 Scope 2 References 2.1 Normative references 2.2 Informative references 3 Definitions 4 Transport and delivery 4.1 Transport 4.2 Delivery 4.3 Discharge 5 Preparatory works at the laying site 5.1 General <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 5.2 Surface level tolerances 5.3 Resurfacing 5.4 Adjustment or regulation of levels 5.5 Tack coat <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 6 Laying of rolled asphalt 6.1 General 6.2 Hand laying 6.3 Mechanical laying <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 6.4 Thickness 6.5 Falls and drainage 6.6 Joints Table 1 – Minimum rolling temperatures 6.7 Projections <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 7 Surface texture 7.1 General 7.2 Method of applying the coated chippings 7.3 Texture-depth <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 8 Rolling 8.1 General 8.2 Equipment 8.3 Compaction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 9 Surface regularity 10 Trafficking <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Hot rolled asphalt for roads and other paved areas – Specification for the transport, laying and compaction of rolled asphalt<\/b><\/p>\n |