{"id":249843,"date":"2024-10-19T16:28:26","date_gmt":"2024-10-19T16:28:26","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-62600-2002013\/"},"modified":"2024-10-25T11:41:02","modified_gmt":"2024-10-25T11:41:02","slug":"bsi-pd-iec-ts-62600-2002013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-62600-2002013\/","title":{"rendered":"BSI PD IEC\/TS 62600-200:2013"},"content":{"rendered":"
IEC\/TS 62600-200:2013(E) provides the following items: – a systematic methodology for evaluating the power performance of tidal current energy converters (TECs) that produce electricity for utility scale and localized grids; – a definition of TEC rated power and rated water velocity; – a methodology for the production of the power curves for the TECs in consideration; – a framework for the reporting of results.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Figures Figure 1 \u2013 Equivalent diameter calculations for various TEC projected capture areas <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4 Symbols, units and abbreviations 4.1 Symbols and units <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.2 Abbreviations <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5 Site and test conditions 5.1 General 5.2 Bathymetry 5.3 Flow conditions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.4 TEC test site constraints <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.5 External constraints 6 Tidal energy converter (TEC) description 6.1 General 6.2 Operational parameters 7 Test equipment 7.1 Electric power measurement <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 7.2 Tidal current measurement <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7.3 Data acquisition 8 Measurement procedures 8.1 General 8.2 Operational status <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.3 Data collection 8.4 Instrument calibration 8.5 Data processing <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 8.6 Averaging 8.7 Test data properties 8.8 Electric power measurement 8.8.1 Output terminals of the TEC <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 8.8.2 The power measurement location 8.8.3 Remote TEC sub-systems 8.8.4 Power measurements 8.9 Incident resource measurement 8.9.1 Current profiler placement relative to TEC <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Figure 2 \u2013 Orientation A for current profiler deployment (plan view) Figure 3 \u2013 Orientation A for current profiler deployment (section view) <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Figure 4 \u2013 Orientation B for current profiler deployment (plan view) Figure 5 \u2013 Orientation B for current profiler deployment (section view) <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 8.9.2 Contribution from turbulence 8.9.3 Contribution from waves Figure 6 \u2013 Orientation for floating TEC current profiler deployment (plan view) <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 9 Derived results 9.1 General 9.1.1 Introductory remarks 9.1.2 Water density 9.2 Data processing 9.2.1 Filtering 9.2.2 Exclusion 9.2.3 Correction 9.3 Calculation of the power curve 9.3.1 Method of bins <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 9.3.2 Detailed description of method of bins <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Figure 7 \u2013 The vertical variation of tidal current across the projected capture area <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 9.3.3 Interpolation 9.3.4 Extrapolation 9.3.5 Uncertainty calculation 9.4 Mean tidal current velocity vertical shear profile <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 9.5 RMS fluctuating tidal current velocity <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 9.6 Tidal ellipse at hub height <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 9.7 Calculation of the TEC overall efficiency 9.8 TEC annual energy production (TEC AEP) <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 10 Reporting format 10.1 General 10.2 TEC report 10.3 TEC test site report <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Figure 8 \u2013 Example tidal ellipse plot identifying principal ebb and flood directions <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 10.4 Electrical grid and load report 10.5 Test equipment report Figure 9 \u2013 Example plot of the channel cross-sectional area consumed by the TEC on plane perpendicular to principal flow direction (plan and section view) <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 10.6 Measurement procedure report 10.7 Presentation of measured data Figure 10 \u2013 Example scatter plot of performance data <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Figure 11 \u2013 Example plot of the mean tidal current velocity vertical shear(mean velocity shear) profile Tables Table 1 \u2013 Example presentation of the mean tidal current velocity vertical shear (mean velocity shear) data <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 10.8 Presentation of the power curve Table 2 \u2013 Example presentation of the RMS fluctuating tidal current velocityat hub height <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Figure 12 \u2013 Example presentation of the power curve Table 3 \u2013 Example presentation of the power curve data <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Figure 13 \u2013 Example presentation of the power curve with uncertainty bars Figure 14 \u2013 Example presentation of the power curve showing excluded data points <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 10.9 Presentation of the TEC overall efficiency Table 4 \u2013 Example presentation of the TEC overall efficiency <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 10.10 Uncertainty assumptions 10.11 Deviations from the procedure Figure 15 \u2013 Example presentation of the TEC overall efficiency curve <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex A (normative) Categories of error Table A.1 \u2013 List of uncertainty parameters to be included in the uncertainty analysis <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Annex B (informative) Uncertainty case study <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex C (informative) Calculation of TEC annual energy production <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Table C.1 \u2013 Example presentation of annual energy production (flood tide shown) <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Annex D (informative) Wave measurement <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Marine energy. Wave, tidal and other water current converters – Electricity producing tidal energy converters. Power performance assessment<\/b><\/p>\n |