{"id":324003,"date":"2024-10-19T22:27:21","date_gmt":"2024-10-19T22:27:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-163252013a12015\/"},"modified":"2024-10-25T21:02:34","modified_gmt":"2024-10-25T21:02:34","slug":"bs-en-163252013a12015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-163252013a12015\/","title":{"rendered":"BS EN 16325:2013+A1:2015"},"content":{"rendered":"

This European Standard specifies requirements for Guarantees of Origin of !Electricity” from all energy sources. This standard will establish the relevant terminology and definitions, requirements for registration, issuing, transferring and cancellation in line with the RES, !Energy Efficiency” and IEM Directives. This standard will also cover measuring methods and auditing procedures.<\/p>\n

These Guarantees of Origin may be traded and\/or used for Disclosure\/Labelling.<\/p>\n

The content of this standard can, for example, be applied, after necessary modifications, to heating, cooling, and gas (including biogas). These modifications are not part of this standard.<\/p>\n

This European Standard will not establish any sustainability criteria, this work is done elsewhere.<\/p>\n

This standard is suitable for certification purposes.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nContents Page <\/td>\n<\/tr>\n
7<\/td>\nEuropean foreword <\/td>\n<\/tr>\n
8<\/td>\n0 Introduction
0.1 General
0.2 Experiences of the Association of Issuing Bodies (AIB), Description of existing voluntary system (EECS)
0.2.1 Association of Issuing Bodies (AIB)
0.2.2 The EECS Rules <\/td>\n<\/tr>\n
9<\/td>\n0.2.3 Registration of production devices
0.2.4 Issuing of EECS Certificates
0.2.5 Use of EECS Certificates
0.2.6 Life cycle <\/td>\n<\/tr>\n
11<\/td>\n1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n
17<\/td>\n4 Main objectives <\/td>\n<\/tr>\n
18<\/td>\n5 Registration of Competent Bodies and their agents
5.1 Appointing authority for Competent Bodies
5.2 Characteristics of Competent Bodies
5.2.1 General
5.2.2 Responsibilities <\/td>\n<\/tr>\n
19<\/td>\n5.2.3 Discretionary powers
5.2.4 Limitations of Competent Bodies owning GOs <\/td>\n<\/tr>\n
20<\/td>\n5.2.5 Confidentiality
5.3 Criteria for qualification of Competent Bodies
5.4 Types of agent <\/td>\n<\/tr>\n
21<\/td>\n5.5 Criteria for qualification of agents
5.6 Obligations of Competent Bodies
5.6.1 General
5.6.2 Verification <\/td>\n<\/tr>\n
22<\/td>\n6 Registration of EGIs and Account Holders
6.1 Application procedure for EGIs
6.1.1 General
6.1.2 Application information <\/td>\n<\/tr>\n
23<\/td>\n6.1.3 Meters
6.2 Application procedure for Account Holders
6.3 Obligations of Registrants
6.4 Revision of Registration Databases <\/td>\n<\/tr>\n
24<\/td>\n7 Issuing and content of a GO
7.1 Format of the GO <\/td>\n<\/tr>\n
25<\/td>\n7.2 The Issuing process
7.3 Declaration of Consumption and Calculation of Output
7.3.1 General <\/td>\n<\/tr>\n
26<\/td>\n7.3.2 Consumption Declaration
7.3.3 Calculation of Output <\/td>\n<\/tr>\n
27<\/td>\n7.4 CO2 emissions and nuclear waste
7.5 Special provisions for High-Efficiency Cogeneration Electrical Energy
7.5.1 Amount of High-Efficiency Cogeneration Electrical Energy Generation produced by an EGI
7.5.2 GO Issued for Electrical Energy which has been found to be High-Efficiency Cogeneration Electrical Energy <\/td>\n<\/tr>\n
28<\/td>\n8 Transferring of GOs
8.1 General
8.2 The Transfer process
8.3 Import\/export from Registration Databases
8.3.1 Receipt of request <\/td>\n<\/tr>\n
29<\/td>\n8.3.2 Rejection of request
8.3.3 Restrictions of exports
8.3.4 Restrictions of imports <\/td>\n<\/tr>\n
30<\/td>\n9 Correction of errors
9.1 Errors during issuing
9.2 Errors during transfer”
10 End of the life of a GO
10.1 General
10.2 Cancellation
10.2.1 Cancellation procedure
10.2.1.1 General <\/td>\n<\/tr>\n
31<\/td>\n10.2.1.2 Requesting a cancellation
10.2.1.3 Cancelling a GO
10.2.1.4 Limitations <\/td>\n<\/tr>\n
32<\/td>\n10.2.2 Requesting and Producing a Cancellation Statement
10.3 Withdrawal
10.4 Expiry <\/td>\n<\/tr>\n
33<\/td>\n11 Measurement and calculation methods
11.1 Metering
11.1.1 General metering principle
11.1.2 Calculation of Nett Electrical Energy
Figure 1 \u2014 Nett Electrical Energy in simple case <\/td>\n<\/tr>\n
34<\/td>\nFigure 2 \u2014 Nett Electrical Energy with On-Site Demand <\/td>\n<\/tr>\n
35<\/td>\nFigure 3 \u2014 Nett Electrical Energy with pumping or storage Auxiliaries
11.1.3 Relevant perimeter
12 Auditing
12.1 Assessment of the National GO Scheme
12.2 Auditing of EGIs <\/td>\n<\/tr>\n
36<\/td>\n12.3 Operational practice <\/td>\n<\/tr>\n
37<\/td>\nAnnex A (normative) Fuel (or heat source) codes
Table A.1 \u2014 Fuel (or heat source) codes <\/td>\n<\/tr>\n
41<\/td>\nAnnex B (normative) Technology codes
Table B.1 \u2014 Technology codes <\/td>\n<\/tr>\n
43<\/td>\nAnnex C (normative) Coding structures
C.1 Introduction
C.2 Coding of Registration Databases
C.3 Coding of certificates
Table C.1 \u2014 Coding of certificates <\/td>\n<\/tr>\n
44<\/td>\nC.4 Coding of Electricity Generation Installations
Table C.2 \u2014 Coding of EGIs
Table C.3 \u2014 Check digit calculation <\/td>\n<\/tr>\n
45<\/td>\nTable C.4 \u2014 Example check digit calculation
C.5 Coding of Account Holder Account IDs <\/td>\n<\/tr>\n
46<\/td>\nC.6 Coding of Technologies <\/td>\n<\/tr>\n
47<\/td>\nAnnex D (normative) Geographical coordinates
Table D.1 \u2014 Geographical coordinates <\/td>\n<\/tr>\n
49<\/td>\nAnnex E (normative) Cogeneration GO codes \u2014 Uses of Heat <\/td>\n<\/tr>\n
50<\/td>\nAnnex F (normative) Relevant perimeter
F.1 Hydraulic continuity principle
F.1.1 General
Figure F.1 \u2014 Hydraulic continuity principle
F.1.2 Extended hydraulic continuity principle <\/td>\n<\/tr>\n
51<\/td>\nFigure F.2 \u2014 Extended hydraulic continuity principle
F.2 Smoothing of Electricity generation
F.3 Electricity storage and conversion
F.4 Alternative measures for a hydraulic plant
F.4.1 Certain flow <\/td>\n<\/tr>\n
52<\/td>\nFigure F.3 \u2014 Complex hydraulic system
F.4.2 Non-energy-based hydraulic systems <\/td>\n<\/tr>\n
54<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Guarantees of Origin related to energy. Guarantees of Origin for Electricity<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2015<\/td>\n56<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":324012,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-324003","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/324003","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/324012"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=324003"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=324003"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=324003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}