{"id":374578,"date":"2024-10-20T02:39:18","date_gmt":"2024-10-20T02:39:18","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iec-60086-12021\/"},"modified":"2024-10-26T04:37:32","modified_gmt":"2024-10-26T04:37:32","slug":"bs-en-iec-60086-12021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iec-60086-12021\/","title":{"rendered":"BS EN IEC 60086-1:2021"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Annex ZA(normative)Normative references to international publicationswith their corresponding European publications <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | English CONTENTS <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4 Requirements 4.1 General 4.1.1 Design 4.1.2 Battery dimensions 4.1.3 Terminals <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.1.4 Classification (electrochemical system) Tables Table 1 \u2013 Standardized electrochemical systems <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.1.5 Designation 4.1.6 Marking <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.1.7 Interchangeability: battery voltage Table 2 \u2013 Marking requirements <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4.2 Performance 4.2.1 Discharge performance 4.2.2 Dimensional stability 4.2.3 Leakage 4.2.4 Open-circuit voltage limits 4.2.5 Service output 4.2.6 Safety <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.2.7 Validity of testing 5 Performance \u2013 Testing 5.1 Capacity testing versus application and service output testing 5.2 Discharge testing 5.2.1 General <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.2.2 Application tests 5.2.3 Service output tests <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.3 Conformance check to a specified minimum average duration 5.4 Guidance for considering proposed value of minimum average duration 5.5 OCV testing 5.6 Insulation resistance 5.7 Battery dimensions 5.8 Leakage and deformation <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6 Performance \u2013 Test conditions 6.1 Storage and discharge conditions 6.2 Commencement of discharge tests after storage 6.3 Discharge test conditions 6.3.1 General 6.3.2 Compliance Table 3 \u2013 Conditions for storage before and during discharge testing <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.4 Load resistance 6.5 Time periods 6.6 Test condition tolerances 6.7 Activation of \u2018P\u2019-system batteries Table 4 \u2013 Resistive loads for tests Table 5 \u2013 Time periods for tests Table 6 \u2013 Test condition tolerances <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.8 Measuring equipment 6.8.1 Voltage measurement 6.8.2 Mechanical measurement 7 Sampling and quality assurance 8 Battery packaging <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annexes Annex A (normative) Criteria for the standardization of batteries Table A.1 \u2013 Items necessary to standardize <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex B (informative) Recommendations for equipment design B.1 Technical liaison B.2 Battery compartment B.2.1 General <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | B.2.2 Limiting access by children B.3 Voltage cut-off <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex C (normative) Designation system (nomenclature) C.1 General C.2 Designation system in use up to October 1990 C.2.1 General C.2.2 Cells <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Table C.1 \u2013 Physical designation and dimensions of round cells and batteries <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | C.2.3 Electrochemical system C.2.4 Batteries Table C.2 \u2013 Physical designation and nominal overall dimensions of flat cells Table C.3 \u2013 Physical designation and dimensions of square cells and batteries <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | C.2.5 Modifiers C.2.6 Examples C.3 Designation system in use since October 1990 C.3.1 General C.3.2 Round batteries <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Figures Figure C.1 \u2013 Designation system for round batteries: d1 < 100 mm; height h1 < 100 mm <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Figure C.2 \u2013 Diameter code for non-recommended diameters Table C.4 \u2013 Diameter code for recommended diameter <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Figure C.3 \u2013 Height code for denoting the hundredths of a millimetre of height <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | C.3.3 Non-round batteries Figure C.4 \u2013 Designation system for round batteries: d1 \u2265 100 mm; height h1 \u2265 100 mm <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Figure C.5 \u2013 Designation system for non-round batteries, dimensions < 100 mm <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Figure C.6 \u2013 Designation system for non-round batteries, dimensions \u2265 100 mm Figure C.7 \u2013 Height code for discrimination per tenth of a millimetre <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | C.3.4 Ambiguity Table C.5 \u2013 Physical designation and dimensions of round cellsand batteries based on Clause C.2 <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Table C.6 \u2013 Physical designation and dimensions of non-round batteries based on Clause C.2 <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex D (informative) Standard discharge voltage Us \u2013 Definition and method of determination D.1 Definition D.2 Determination D.2.1 General considerations: the C\/R-plot <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | D.2.2 Determination of the standard discharge resistor Rs Figure D.1 \u2013 Normalized C\/R-plot (schematic) <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | D.2.3 Determination of the standard discharge capacity Cs and standard discharge time ts Figure D.2 \u2013 Standard discharge voltage (schematic) <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | D.3 Experimental conditions to be observed and test results Table D.1 \u2013 Standard discharge voltage by system <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex E (informative) Preparation of standard methods of measuring performance (SMMP) of consumer goods E.1 General E.2 Performance characteristics E.3 Criteria for the development of test methods <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex F (informative) Guidance for proposing value of minimum average duration F.1 General F.2 Sampling F.3 Calculation method <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Annex G (normative) Code of practice for packaging, shipment, storage, use and disposal of primary batteries G.1 General G.2 Packaging G.3 Transport and handling G.4 Storage and stock rotation <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | G.5 Displays at sales points G.6 Selection, use and disposal G.6.1 Purchase G.6.2 Installation G.6.3 Use <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | G.6.4 Replacement G.6.5 Disposal <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Annex H (informative) Compliance checklist <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Primary batteries – General<\/b><\/p>\n |