{"id":435270,"date":"2024-10-20T07:48:42","date_gmt":"2024-10-20T07:48:42","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-4064-12017a112022\/"},"modified":"2024-10-26T14:48:18","modified_gmt":"2024-10-26T14:48:18","slug":"bs-en-iso-4064-12017a112022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-4064-12017a112022\/","title":{"rendered":"BS EN ISO 4064-1:2017+A11:2022"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Section sec_1 Section sec_2 Section sec_3 Section sec_3.1 Section sec_3.1.1 1 Scope 2 Normative references 3 Terms and definitions 3.1 Water meter and its constituents <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Section sec_3.1.2 Section sec_3.1.3 Section sec_3.1.4 Section sec_3.1.5 Section sec_3.1.6 Section sec_3.1.7 <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Section sec_3.1.8 Section sec_3.1.9 Section sec_3.1.10 Section sec_3.1.11 Section sec_3.1.12 Section sec_3.1.13 Section sec_3.1.14 <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Section sec_3.1.15 Section sec_3.1.16 Section sec_3.1.17 Section sec_3.1.18 Section sec_3.1.19 Section sec_3.1.20 Section sec_3.1.21 Section sec_3.1.22 Section sec_3.1.23 Section sec_3.1.24 <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Section sec_3.2 Section sec_3.2.1 Section sec_3.2.2 Section sec_3.2.3 Section sec_3.2.4 Section sec_3.2.5 Section sec_3.2.6 Section sec_3.2.7 Section sec_3.2.8 3.2 Metrological characteristics <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Section sec_3.2.9 Section sec_3.2.10 Section sec_3.2.11 Section sec_3.2.12 Section sec_3.2.13 Section sec_3.2.14 Section sec_3.3 Section sec_3.3.1 Section sec_3.3.2 3.3 Operating conditions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Section sec_3.3.3 Section sec_3.3.4 Section sec_3.3.5 Section sec_3.3.6 Section sec_3.3.7 Section sec_3.3.8 Section sec_3.3.9 Section sec_3.3.10 Section sec_3.3.11 <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Section sec_3.3.12 Section sec_3.3.13 Section sec_3.3.14 Section sec_3.4 Section sec_3.4.1 Section sec_3.4.2 Section sec_3.4.3 3.4 Test conditions <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Section sec_3.4.4 Section sec_3.4.5 Section sec_3.4.6 Section sec_3.4.7 Section sec_3.4.8 Section sec_3.4.9 Section sec_3.4.10 Section sec_3.4.11 Section sec_3.4.12 <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Section sec_3.4.13 Section sec_3.5 Section sec_3.5.1 Section sec_3.5.2 Section sec_3.5.3 Section sec_3.5.4 Section sec_3.5.5 Section sec_3.5.6 3.5 Electronic and electrical equipment <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Section sec_3.5.7 Section sec_3.5.8 Section sec_3.6 Section sec_4 Section sec_4.1 Section sec_4.1.1 Section sec_4.1.2 Section sec_4.1.3 Section sec_4.1.4 Section sec_4.1.5 Section sec_4.1.6 3.6 Use of certain terms within the European Economic Area 4 Metrological requirements 4.1 Values of Q1, Q2, Q3, and Q4 <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Section sec_4.2 Section sec_4.2.1 Section sec_4.2.2 Section sec_4.2.3 Section sec_4.2.4 Table tab_1 Section sec_4.2.5 4.2 Accuracy class and maximum permissible error <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Section sec_4.2.6 Section sec_4.2.7 Section sec_4.2.8 Section sec_4.2.9 Section sec_4.2.10 Section sec_4.3 Section sec_4.3.1 Section sec_4.3.2 4.3 Requirements for meters and ancillary devices <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Section sec_4.3.3 Section sec_4.3.4 Section sec_4.3.5 Section sec_4.3.6 <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Section sec_5 Section sec_5.1 Section sec_5.1.1 Section sec_5.1.2 Section sec_5.1.3 Section sec_5.1.4 Section sec_5.2 Section sec_5.2.1 Section sec_5.2.2 Section sec_5.2.2.1 5 Water meters equipped with electronic devices 5.1 General requirements 5.2 Power supply <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Section sec_5.2.2.2 Section sec_5.2.2.3 Section sec_5.2.3 Section sec_5.2.3.1 Section sec_5.2.3.2 Section sec_5.2.4 Section sec_5.2.4.1 Section sec_5.2.4.2 Section sec_5.2.4.3 Section sec_5.2.4.4 Section sec_5.2.4.5 Section sec_6 Section sec_6.1 Section sec_6.1.1 Section sec_6.1.2 6 Technical requirements 6.1 Materials and construction of water meters <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Section sec_6.1.3 Section sec_6.1.4 Section sec_6.1.5 Section sec_6.1.6 Section sec_6.1.7 Section sec_6.1.8 Section sec_6.1.9 Section sec_6.2 Section sec_6.2.1 Section sec_6.2.2 Section sec_6.3 Section sec_6.3.1 Section sec_6.3.2 Section sec_6.3.3 Section sec_6.3.4 6.2 Adjustment and correction 6.3 Installation conditions <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Section sec_6.3.5 Table tab_2 Table tab_3 <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Section sec_6.4 Section sec_6.5 Table tab_4 Section sec_6.6 Section sec_6.6.1 Section sec_6.6.2 6.4 Rated operating conditions 6.5 Pressure loss 6.6 Marks and inscriptions <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Section sec_6.7 Section sec_6.7.1 Section sec_6.7.1.1 Section sec_6.7.1.2 Section sec_6.7.1.3 Table tab_5 6.7 Indicating device <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Section sec_6.7.1.4 Section sec_6.7.2 Section sec_6.7.2.1 Section sec_6.7.2.2 <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Section sec_6.7.2.3 Section sec_6.7.3 Section sec_6.7.3.1 Section sec_6.7.3.2 Section sec_6.7.3.2.1 Section sec_6.7.3.2.2 Section sec_6.7.3.2.3 <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Section sec_6.7.3.3 Section sec_6.8 Section sec_6.8.1 Section sec_6.8.2 Section sec_6.8.2.1 Section sec_6.8.2.2 Section sec_6.8.2.3 Section sec_7 Section sec_7.1 6.8 Protection devices 7 Metrological controls 7.1 Reference conditions <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Section sec_7.2 Section sec_7.2.1 Section sec_7.2.2 Table tab_6 Section sec_7.2.3 7.2 Type evaluation and approval <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Section sec_7.2.4 Section sec_7.2.5 Section sec_7.2.6 Section sec_7.2.6.1 Section sec_7.2.6.2 Section sec_7.2.6.3 <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Section sec_7.2.7 Section sec_7.2.8 Section sec_7.2.9 Section sec_7.2.9.1 Section sec_7.2.9.2 <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Section sec_7.2.9.3 Section sec_7.2.10 Section sec_7.2.11 Section sec_7.2.11.1 Section sec_7.2.11.2 Section sec_7.2.11.3 <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Section sec_7.2.12 Section sec_7.2.12.1 Section sec_7.2.12.2 Section sec_7.2.12.2.1 Section sec_7.2.12.2.2 Section sec_7.2.12.2.3 Section sec_7.2.12.2.4 Section sec_7.3 Section sec_7.3.1 7.3 Initial verification <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Section sec_7.3.2 Section sec_7.3.3 Section sec_7.3.4 Section sec_7.3.5 Section sec_7.3.6 <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Annex sec_A Annex sec_A.1 Annex sec_A.2 Annex sec_A.3 Annex A \n(normative)<\/p>\n Performance tests for water meters with electronic devices <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex sec_A.4 Annex sec_A.4.1 Annex sec_A.4.2 Annex sec_A.4.3 Annex sec_A.5 Table tab_A.1 <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex sec_B Annex sec_B.1 Annex sec_B.2 Annex sec_B.2.1 Annex sec_B.2.2 Annex B \n(normative)<\/p>\n Checking facilities <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex sec_B.2.3 Annex sec_B.2.4 Annex sec_B.2.5 Annex sec_B.3 Annex sec_B.3.1 <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Annex sec_B.3.2 Annex sec_B.3.3 Annex sec_B.4 Annex sec_B.4.1 Annex sec_B.4.2 <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex sec_B.4.3 Annex sec_B.4.4 Annex sec_B.4.5 Annex sec_B.5 Annex sec_B.6 <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Annex sec_C Annex C \n(informative)<\/p>\n Permissible errors in service and subsequent verification <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Reference ref_1 Reference ref_2 Reference ref_3 Reference ref_4 Reference ref_5 Reference ref_6 Reference ref_7 Reference ref_8 Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Water meters for cold potable water and hot water – Metrological and technical requirements<\/b><\/p>\n |